| Address | Pho Noi B Textile and Garment Industrial Park, Yen My district, Hung Yen Province |
| Province | Hung Yen |
| Developer | Hung Yen IZ Management Authority |
| Total area | 122 ha |
| Phase 1 | 25 ha |
| Free land | 97 ha |
| GPS | 20.9258, 106.061 |
The main road is the two-way street, 7.5mx2 in width. Tree range: 8m in width The separating strip is 2m, the pavements along the road is 8m-9m
The electric power of 20.000 kVA, 50HZ for the IP within mall oscilatio supplied by Hung Yen Power company.This electricity is reserved of industrial production.
Water supply station with capacity of 17,000 m3/day.
Water supply system is connected directly to the fence of enterprise
Wastewater treatment station with capacity of 10,000 m3/day and can be enhanced to 12,000 m3/day.Provided by the Netherlands and installed in accordance with European standards II
Modern communication system reaching international standard and ready to meet full demands concerning on national and international communication services
E = 120-125 kG/cm2 Ro = 1.3-1.4 kG/ cm2
Remission of import duties for machines, equipment; special-use transport means in technological line and in workers transport (buses from 24 seats and above, waterway means)
* Investment incentives:
- Delivery of turn-key package during investment application until the business license is granted.
- Delivery of turn-key package of design and construction services for clients.
- Provision of credit with various options subject to the financial capability of the clients
- Land use tax free until 2020.
- Provision of recruitment services for client.