Industrial Park Profile
Đồng An 2
Ho Chi Minh City Industrial Park (Data) 235 ha total
Đồng An 2
Key Metrics
235
Total Area (ha)
210
Free Land (ha)
—
To Seaport
—
To Airport
Overview & Location
AddressPhường Hòa Phú - Thị Xã Thủ Dầu Một - Tỉnh Bình Dương
ProvinceHo Chi Minh City
DeveloperDONG AN INDUSTRIAL DEVELOPMENT CORPORATION
Total area235 ha
Free land210 ha
GPS11.122491, 106.689429
Infrastructure & Utilities
Traffic & Connectivity

 Width: 23-28m

Power Supply

• Power supply: Dong An II IP is supplied from national grid with capacity of 120 MW/day, 100/22 KV transformer station, 22Kv overhead wire run to each land slot

Water Supply

Waste treatment: the waste water treatment plant of 3,000 m3/day is 80% completed, and a solid waste collection and transfer station is being constructed, guaranteeing the environment protection the the industrial park

Wastewater Treatment

Waste treatment: the waste water treatment plant of 3,000 m3/day is 80% completed, and a solid waste collection and transfer station is being constructed, guaranteeing the environment protection the the industrial park

Site Conditions & Geology

•• The landscape is pretty flat, stiff down from North West to South East • Average altitude 28-32 meter above sea level, absolutely no earthquake or flood • Soil loadability average at 2.5kg/cm2 and above, saving significant construction cost for investors • Average temperature 26.7oC, highest 33 oC in March/April, lowest 22 oC in December • Average humidity @ 82% • Annual rain level 1882mm • Annual sunlight time 2,526 hours

Policies & Incentives
Investment Process
The investment processes: 1. The investors sign in the understanding memorandums of land lease in Dong An IP. 2. The customer service team of Dong An IP supplies the registration forms and guides the investors to complete the forms. 3. The investors send all full related documents to the customer service team of Dong An IP. 4. Dong An customer service team submits the documents to the authorities to apply for business license (local) or Certificate of investment (FDI projects). 5. Two weeks from the date of submitting the documents, legal representatives of the investors will be guided to receive the investment license from the authorities. Dong An staffs can also take care of this step if so requested by a power of attorney issued by investor. 6. Dong An customer service team guides the investors to complete the procedures of registering legal stamps at police office and tax codes at tax office. After getting the business licenses and the stamps, the investors can start their operation, with some key steps described as followed: 7. Open bank accounts. 9. Land hand-over. 10. Conduct Soil Survey. 11. Complete detail design of the factory, including Fire protection system. 12.Prepare Environmental Impact Assessment of Environment Protection Commitment and get approved. 13. Get Fire protection system design approved by Binh Duong Fire Police 14. Apply for construction permit at Binh Duong Industrial Parks Authority (BDIZA). 17. Start construction. 18. Submit Construction Completion report and get approved by BDIZA.
Services
• The service area of the industrial park with the purpose to serve leisure needs of investors like hotel, restaurant, tennis court and swimming pool, especially the golf driving range, is also being developed and will be ready for use by mid 2009. • There will be banks, post office within the industrial park serving your business needs. • We offer to the investors end-to-end supply chain related services like investment license (free of charge), human resources recruiting, supply and management, customs clearance and transportation, catering service, waste collection and treatment, training of skilful workforce (via our own Dong An Polytechnic nearby)…
Developer Contact
DONG AN INDUSTRIAL DEVELOPMENT CORPORATION
(84-650 3589 386) or (84-650 3589 388)
Fax: 84-650 3589 389