Industrial Park Profile
Long Hau
Tay Ninh Province Industrial Park (Data) 248 ha total
Long Hau
Key Metrics
248
Total Area (ha)
—
Free Land (ha)
—
To Seaport
—
To Airport
Overview & Location
AddressLong Hau Commune, Can Giuoc District, Long An Province
ProvinceTay Ninh Province
DeveloperLong Hau Joint - Stocked Company
Total area248 ha
Phase 1141 ha
GPS10.635757, 106.15921
Long Hau — 248ha, former Long An; IP in Tay Ninh Province.
Infrastructure & Utilities
Traffic & Connectivity

Main road: 40 m
INFRASTRUCTURE: 100% completed.
- Road system:
Connecting with Ho Chi Minh city via Nguyen Huu Tho alignment road (North - South) with capacity of 10 lane lines.
The traffic network is designed to connect with other neighborcities and provinces:
+ National highway 1A to Mekong delta provinces – Ho Chi Minh – Trung Luong.
+ Long Hau – Tan Tap – National Highway to Mekong delta provinces.
+ Phu Mybridge to Eastern provinces.
+ Ho Chi Minh city belt road system No. 4 - Southern inter-regional highway system.
- Waterway traffic system:
+ Connecting to deep water ports of Ho Chi Minh city including Sai Gon Premier Container Terminal (SPCT) which can receive vessels from 4,000 - 5,000 TEU.
+ Sai Gon Hiep Phuoc portcan receive vessels 50,000 tons.
+ Tan Cang Hiep Phuoc port can receive vessels 40,000 tons.
+ Kinh River port inside Long Hau Industrial Parkcan receive vessel 1,000 tons and barge 2,000 tons, meeting the demand of manufacturers in Long Hau Industrial Park for water transport at low cost. With the average width of 130m and transport depth from 6.8 - 10.3m, Kinh river connects to the most important waterway transportation of Ho Chi Minh city: Sai Gon - Nha Be - Mekong delta provinces, Eastern provinces and the East Sea.

Power Supply

+ Power line: 15 Kv

Step-down station EVN 110/22KV - 37 MWA (inside Long Hau Industrial Park).

Power source: 22 KV - Frequency: 50 Hz

Water Supply

10,000 – 12,000 m3/day Clean water
• QCVN 09:2008 (Groundwater Quality of National Standard)
• QCVN 01:2009 (Potable water Quality of National Standard)

Wastewater Treatment

+ Capacity: 5000 m3/day

The central sewage treatment plant with 10,000m2 is in charge of treating pre-treated sewage from factories in Long Hau industrial park. Total treatment capacityis 5,000m3/day.

Telecommunications

While Long Hau IP is in Long An, the tenants can use Ho Chi Minh city’s phone number and the most advanced telecommunication technologies including cable internet, leased line… to make sure telecommunication always works properly, saving costs of calling to Ho Chi Minh numbers.

Phone: Use HCM area code (08)

Site Conditions & Geology

- Topography: alluvial delta, lower from West to East.
- Land high standard: 2.5 m
- Soil bearing capacity: Rtc= 55.1 kPa
- Underground water level: 200m from ground.
- Surface rupture stability: stable.

Policies & Incentives
Investment Policies

Free of 02 years, 50% in the next 04 years. 20% corporate income tax.

1. Food processing. Sea food processing.
2. Supporting industries.
3. Warehouse, logistic.
4. High-tech, R&D industries.
5. Mechanical installation. High precision mechanic.
6. Construction material (no cement and iron casting)
7. Low toxic chemical production and processing.
8. Manufacturing products from wood and bamboo.
9. Package printing and related services (no ink production).
10. Consumer goods.
11. Fashion and textile.

Investment Process

Developer Contact
Long Hau Joint - Stocked Company
(84-8)3 8620 158 - 3 8620159
Fax: (84-8)3 8634 910