Industrial Park Profile
Thanh Thanh Cong Industrial Zone
Tay Ninh Province Industrial Park (Data) 1,020 ha total
Thanh Thanh Cong Industrial Zone
Key Metrics
1,020
Total Area (ha)
760
Free Land (ha)
—
To Seaport
—
To Airport
Overview & Location
ProvinceTay Ninh Province
DeveloperCty Cổ phần Khu công nghiệp Thành Thành Công
Total area1,020 ha
Phase 1360 ha
Free land760 ha
Free factory100,000 m²
GPS11.025222, 106.312056
Thanh Thanh Cong Industrial Zone — 1,020ha, Tay Ninh; IP in Tay Ninh Province.
Occupancy Status (as of 01/05/2026)
72.6% Filling Fast
Occupancy rate
Occupied: 740.5 ha Available: 279.5 ha
Infrastructure & Utilities
Traffic & Connectivity

Internal asphalt-concrete road system is designed and built in

compliance with standards of H30 loading capacity.
Main roads: from 30m to 40m wide; from 2 lanes to 6 lanes

Power Supply

First stage: supplied by the government power system through

Trang Bang power station (110kV/22kV)
Second stage: and internal power station with productivity of 200 MW will be developed

as a national project.
 Unit price: according to standard taiff of EVN 

Water Supply
Total designed productivity: 37.000 m3/day&night
First stage: 3000 m
3/day&night (completed on October 2010)
Unit price: 4.500 VND/m
3
Wastewater Treatment
Total designed productivity: 30.000 m3/day&night
First stage: 3000 m
3 /day&night (completed on October 2010)
Unit price: 4.500 VND/m
3
Telecommunications
Standard system developed by VNPT or FPT
Site Conditions & Geology

"Topographic and geological characteristic: Land is flat and even; leveling altitude +1.9m compared to the Hondau national benchmark; land bearing capacity 600kg/sqm; coefficent of compressibility k>=0.85"

Policies & Incentives
Investment Policies

Bourbon Anhoa is developing an industrial park which is smoothly connected with the regional infrastructure. We not only provide utilities to assure productivity to the investors but also positively contribute to the sustainable development of the community. Therefore, we are concurrently developing three projects in the area: 760 ha of industrial land, 76 ha of residential area, and 186 ha of a river port. Moreover, invesstor in light industries and green industries are especially welcome in our industrial park.

Investment Process

1. Bourbon Anhoa asks for advice and approvement of Taniza (Industrial park management department of Tay Ninh) to receive the investor.

2. Sign land reservation agreement after the investor choose a landlot

3. Apply for investment license (Bourbon will get the license for the investor within 3 to 7 days)

4. Sign land sub-lease contract

5. Land handover

6. Apply for factory building license (20 days)

7. Install the system of infrastructure (water, power, telecommunication...) 8. Start operation"

Services

- Domitory for workers
- Water supply and waste water treatment system
- Collection and treatment of solid wastes
- Importing and exporting  services
- Training and employment
- River port to handle raw material

Developer Contact
Cty Cổ phần Khu công nghiệp Thành Thành Công