Dong Nai: Adjusting and adding IPs oriented from 2015- 2020

Dong Nai: Adjusting and adding IPs oriented from 2015- 2020
 
The Prime Minister has agreed with construction of Long Thanh Service – Urban and High – Tech Industrial Park with 1,922ha in area including 500-ha-high-tech-industrial-park area.
 
The catalogues of the industrial park (IP) is prior to manufacture and expand as following:

- Adjusting the area of An Phuoc IP from 130ha to 201ha; Tan Phu IP from 54ha to 130ha; and Long Duc IP from 450ha to 580ha.
-Adding the catalogues of expand-to-expected-IPs such as Xuan Loc IP with the area of 200ha and Amata IP with 180ha in area.
Besides, the IPs are expected to be set up such as Long Thanh high-tech IP (500ha); Phuoc Binh IP (190ha); Cam My IP (300ha); Gia Kiem IP (330ha) and Suoi Tre IP (150ha).