VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.
500 ha Phase 2 expansion of Ca Na cluster, energy and metallurgical heavy industries.
Ca Na Expansion Industrial Park spans 500 ha in Thuan Nam district (former Ninh Thuan, now Khanh Hoa). The expansion of Ca Na I (827 ha) integrates with the planned Ca Na LNG-to-power cluster and the Hoa Sen Group integrated steel complex. Focus on metallurgy, energy support, and chemical industries.
Direct connection to Ca Na coastal power grid + LNG-to-power plant (planned).
Internal water + desalination: 18,000 m³/day.
WWTP: 10,000 m³/day, Class A.
Highest CIT incentives (Ninh Thuan economically disadvantaged) + EZ-zone special preference.
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
Reference data — based on IP land, power, water prices and regional minimum wage 4.
| Data | Source | Last verified | Status |
|---|---|---|---|
| Overview & legal | Not provided | Not verified | Unverified |
| Prices & fees | Not provided | Not verified | Unverified |
| Available land & occupancy | Not provided | Not verified | Unverified |
| Infrastructure | Not provided | Not verified | Unverified |
| Logistics | Not provided | Not verified | Unverified |
Occupancy, price movements, and infrastructure status updated over time.
Quarterly rental price trends from aggregated market sources.
* Prices are indicative. Contact the industrial park management board for official quotations.
Share practical feedback about infrastructure, service, pricing, and site experience.
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.