IP located in former Long An area, Tay Ninh Province (after Long An merger).
Infrastructure
Geology
Soft soil
Traffic
Main road system
+ Width: 33m
+ Lane Amount: 4 lines
Power supply
The National grid: voltage from 22KV to 110 KV
+ On-site 3x63 MVA transformer station
Water supply
On-site water treatment plant, capacity 2.000 m3 - 2.500m3/day night
Wastewater treatment
Capacity 4,200 m3/day night, meet TCVN 5945:2005 level A standards, before being discharge
Internet
FTTH fibre coverage; VNPT/Viettel/FPT/CMC services; ≥1Gbps for enterprise tenants.
Pricing
Land rental
Deposit: 10%
Land payment terms
- Deposit 10% of the Land leased Price
- Pay 40% of Land leased Price (within ten (10) working days from the date of signing Land lease Contract )
- Pay 30% of Land Price (following 6 months from the date of signing Land lease Contract )
- Pay 20% of Land Price (following 12 months from the date of signing Land lease Contract )
Service charges
Management fee:
0,16 USD/m2/year month payment
Maps & Layout
Subdivision map
TMBKCN.jpg
Infrastructure map
so do chi duong.jpg
Policies & Services
Policies
CIT incentive: 10% for 15 years, 4-year exemption + 50% reduction for 9 more years (Law on Investment 2020). 11-year land rent exemption. HCM-belt IPs benefit from strong logistics infrastructure.
Distance modeBy road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1
Can Tho Port
Nearest
60.0 km
Not loaded
2
Saigon Port
74.6 km
Not loaded
3
Cat Lai Port
82.9 km
Not loaded
4
Phu My Port
104.3 km
Not loaded
5
Cai Mep Port
104.8 km
Not loaded
1
Vinh Long River Port
Nearest
28.6 km
Not loaded
2
My Tho River Port
33.0 km
Not loaded
3
Binh Duong River Port
84.9 km
Not loaded
4
Long Binh Tan River Port
101.7 km
Not loaded
5
Dong Nai River Port
112.1 km
Not loaded
1
Can Tho Int. Airport (VCA)
Nearest
60.5 km
Not loaded
2
Tan Son Nhat Int. Airport
72.8 km
Not loaded
3
Long Thanh Airport (future)
109.7 km
Not loaded
4
Rach Gia Airport (VKG)
119.7 km
Not loaded
5
Con Dao Airport (VCS)
204.1 km
Not loaded
1
HCM - Long An - Tien Giang Expressway
Nearest
14.4 km
Not loaded
2
Trung Luong - My Thuan Expressway (CT21)
15.1 km
Not loaded
3
HCM - Trung Luong Expressway (CT15)
32.6 km
Not loaded
4
My Thuan - Can Tho Expressway (CT22)
37.8 km
Not loaded
5
HCM - Moc Bai Expressway (CT18)
68.3 km
Not loaded
1
Saigon Railway Station
Nearest
72.6 km
Not loaded
2
Bien Hoa Railway Station
96.1 km
Not loaded
3
Nha Trang Railway Station
391.2 km
Not loaded
4
Da Nang Railway Station
662.2 km
Not loaded
5
Hue Railway Station
684.8 km
Not loaded
1
Vinh Long City
Nearest
28.6 km
Not loaded
2
My Tho City
33.6 km
Not loaded
3
Tan An City
36.3 km
Not loaded
4
Sa Dec City
42.0 km
Not loaded
5
Ben Tre City
42.4 km
Not loaded
Straight-line distance is an estimate. Road distance is calculated from the available routing service.
Investment Decision Tools
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
CIT Tax Incentive
Tax rate
10%
Địa bàn KT-XH đặc biệt khó khăn
100% exempt4 years
50% reduction9 years
Total incentive15 years
NĐ 218/2013/NĐ-CP
Minimum Wage Region Region 4
3.450.000 ₫/month
Hourly wage16.600 ₫
Effective from2024-07-01
Workforce & Education
Province population3,254K people
Setup Cost Estimator Interactive
Reference data — based on IP land, power, water prices and regional minimum wage 4.
Occupancy, price movements, and infrastructure status updated over time.
Recorded data
Price history chart
Quarterly rental price trends from aggregated market sources.
Loading data...
No price history is available for this type.
* Prices are indicative. Contact the industrial park management board for official quotations.
Ratings & Reviews (0)
Share practical feedback about infrastructure, service, pricing, and site experience.
0.0
0 reviews
5
0
4
0
3
0
2
0
1
0
Write a review
FAQ
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.
Investors should review land availability, lease term, infrastructure readiness, utilities, workforce access, logistics distance, management support, and applicable investment incentives before making a site visit or reservation.
Straight-line distance is estimated from map coordinates. Road distance is calculated through the routing service when you switch the Logistics Distance mode to By road.
Yes. Use the Contact / Send inquiry form on this page and include your required land area, factory size, industry, timeline, and preferred contact method.
Typical documents include company profile, proposed project scope, investment capital, land or factory demand, environmental requirements, and expected implementation schedule.
Contact / Send inquiry
Send your requirements to the industrial park team. We will route the message with the selected purpose and project details.
Login
Select Location
Filter products by location
Product successfully added to your cart!
VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.