Hai PhongIndustrial Park (Data)Hung Dao Industrial Park Management Board +84 220 3850 888[email protected]
Hung Dao IP (200 ha) is a nationally planned industrial zone in Tu Ky district, Hai Phong City (former Hai Duong province), adjacent to the Hanoi – Hai Phong expressway. Actively seeking infrastructure investors.
Located in Hung Dao, Ngoc Ky, Tai Son and Tan Ky communes, Tu Ky district (former Hai Duong province), now Hai Phong City. Northern boundary abuts the Hanoi – Hai Phong expressway. Distance to Hai Phong city ~40 km; Hai Phong port ~40 km; Cat Bi airport ~45 km.
Infrastructure
Traffic
Hanoi – Hai Phong expressway (Tu Ky/Hung Dao access); QL391. Hai Phong port ~40 km; Cat Bi airport ~45 km; Hanoi ~70 km.
Power supply
Grid power 110/22 kV; 3-phase industrial. Off-peak 1,200 VND/kWh; Normal 1,900 VND/kWh; Peak 2,900 VND/kWh.
Water supply
Clean water from Tu Ky municipal water plant; capacity 3,000–5,000 m³/day planned.
Wastewater treatment
Centralised wastewater treatment to QCVN 40:2011; 12,000 VND/m³.
Communication
Fibre-optic internet planned; full telecom from national grid.
Pricing
Land rental
Land lease: ~55 USD/m² (full 50-year term). Minimum plot 1 ha. Prices indicative – zone seeking infrastructure investor.
Off-peak 1,200 VND/kWh; Normal 1,900 VND/kWh; Peak 2,900 VND/kWh.
Water tariff
Water: 10,500 VND/m³.
Wastewater fee
Wastewater treatment: 12,000 VND/m³.
Service charges
Infrastructure service fee: 0.4 USD/m²/year.
Policies & Services
Policies
CIT: 17% for 10 years; 2-year exemption + 50% reduction for 4 years. Land rent exemption for new investment. Import duty exemption on fixed-asset equipment.
Distance modeBy road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1
Hai Phong Port
Nearest
23.7 km
Not loaded
2
Cai Lan Port
63.4 km
Not loaded
3
Nghi Son Port
178.8 km
Not loaded
4
Vung Ang Port
310.6 km
Not loaded
5
Chan May Port
530.0 km
Not loaded
1
Nam Dinh River Port
Nearest
58.6 km
Not loaded
2
Hanoi River Port
60.9 km
Not loaded
3
Ninh Binh River Port
84.0 km
Not loaded
4
Viet Tri River Port
118.7 km
Not loaded
5
Binh Duong River Port
1,099.1 km
Not loaded
1
Cat Bi Int. Airport
Nearest
29.1 km
Not loaded
2
Noi Bai Int. Airport
77.3 km
Not loaded
3
Tho Xuan Airport (THD)
148.6 km
Not loaded
4
Vinh Airport (VII)
250.7 km
Not loaded
5
Dong Hoi Airport (VDH)
373.3 km
Not loaded
1
Hanoi - Hai Phong Expressway (CT03)
Nearest
26.8 km
Not loaded
2
Hanoi - Bac Giang Expressway (CT05)
55.4 km
Not loaded
3
Ha Long - Hai Phong Expressway (CT10)
60.0 km
Not loaded
4
Hanoi - Thai Nguyen Expressway (CT02)
63.2 km
Not loaded
5
CT01 Expressway: Phap Van - Ninh Binh
70.1 km
Not loaded
1
Hai Phong Railway Station
Nearest
24.8 km
Not loaded
2
Hanoi Railway Station
65.5 km
Not loaded
3
Vinh Railway Station
257.3 km
Not loaded
4
Dong Hoi Railway Station
376.7 km
Not loaded
5
Hue Railway Station
503.9 km
Not loaded
1
Hai Duong City
Nearest
16.0 km
Not loaded
2
Hai Phong City
24.9 km
Not loaded
3
Hung Yen City
48.4 km
Not loaded
4
Bac Ninh City
52.4 km
Not loaded
5
Nam Dinh City
58.0 km
Not loaded
Straight-line distance is an estimate. Road distance is calculated from the available routing service.
Investment Decision Tools
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
CIT Tax Incentive
Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt2 years
50% reduction4 years
Total incentive10 years
NĐ 218/2013/NĐ-CP
Minimum Wage Region Region 4
3.450.000 ₫/month
Hourly wage16.600 ₫
Effective from2024-07-01
Workforce & Education
Province population4,664K people
Setup Cost Estimator Interactive
Reference data — based on IP land, power, water prices and regional minimum wage 4.
Occupancy, price movements, and infrastructure status updated over time.
Recorded data
Price history chart
Quarterly rental price trends from aggregated market sources.
Loading data...
No price history is available for this type.
* Prices are indicative. Contact the industrial park management board for official quotations.
Ratings & Reviews (0)
Share practical feedback about infrastructure, service, pricing, and site experience.
0.0
0 reviews
5
0
4
0
3
0
2
0
1
0
Write a review
FAQ
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.
Investors should review land availability, lease term, infrastructure readiness, utilities, workforce access, logistics distance, management support, and applicable investment incentives before making a site visit or reservation.
Straight-line distance is estimated from map coordinates. Road distance is calculated through the routing service when you switch the Logistics Distance mode to By road.
Yes. Use the Contact / Send inquiry form on this page and include your required land area, factory size, industry, timeline, and preferred contact method.
Typical documents include company profile, proposed project scope, investment capital, land or factory demand, environmental requirements, and expected implementation schedule.
Contact / Send inquiry
Send your requirements to the industrial park team. We will route the message with the selected purpose and project details.
Login
Select Location
Filter products by location
Product successfully added to your cart!
VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.