VIIPIP Vietnam Industrial Parks
English
English Vietnamese

Hung Dao Industrial Park

Hai Phong Industrial Park (Data) Hung Dao Industrial Park Management Board +84 220 3850 888 [email protected]

Hung Dao IP (200 ha) is a nationally planned industrial zone in Tu Ky district, Hai Phong City (former Hai Duong province), adjacent to the Hanoi – Hai Phong expressway. Actively seeking infrastructure investors.

Total area
200 ha
Land price
55 USD/m²
Occupancy rate100%
200 / 200 ha leased · 0 ha available
Land rate lower than province avg 30% (Prov. avg: 78.4)
🗺️ Province investment snapshot: Hai Phong
View full profile →
4,664K
Population
7.1M
Income/mo
70.2
PCI
$29.8B
FDI stock
217
Wards
3,195
km²
0km
To port

Overview

Address

Tu Ky district, Hai Phong City

About / Location

Located in Hung Dao, Ngoc Ky, Tai Son and Tan Ky communes, Tu Ky district (former Hai Duong province), now Hai Phong City. Northern boundary abuts the Hanoi – Hai Phong expressway. Distance to Hai Phong city ~40 km; Hai Phong port ~40 km; Cat Bi airport ~45 km.

Infrastructure

Traffic

Hanoi – Hai Phong expressway (Tu Ky/Hung Dao access); QL391. Hai Phong port ~40 km; Cat Bi airport ~45 km; Hanoi ~70 km.

Power supply

Grid power 110/22 kV; 3-phase industrial. Off-peak 1,200 VND/kWh; Normal 1,900 VND/kWh; Peak 2,900 VND/kWh.

Water supply

Clean water from Tu Ky municipal water plant; capacity 3,000–5,000 m³/day planned.

Wastewater treatment

Centralised wastewater treatment to QCVN 40:2011; 12,000 VND/m³.

Communication

Fibre-optic internet planned; full telecom from national grid.

Pricing

Land rental

Land lease: ~55 USD/m² (full 50-year term). Minimum plot 1 ha. Prices indicative – zone seeking infrastructure investor.

Factory / Workshop

Ready-built factory: ~4.0 USD/m²/month (indicative).

Power tariff

Off-peak 1,200 VND/kWh; Normal 1,900 VND/kWh; Peak 2,900 VND/kWh.

Water tariff

Water: 10,500 VND/m³.

Wastewater fee

Wastewater treatment: 12,000 VND/m³.

Service charges

Infrastructure service fee: 0.4 USD/m²/year.

Policies & Services

Policies

CIT: 17% for 10 years; 2-year exemption + 50% reduction for 4 years. Land rent exemption for new investment. Import duty exemption on fixed-asset equipment.

Project Location & Nearby

Searching within 5 km radius
Loading data…

Logistics Distance

Distance mode By road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1 Hai Phong Port Nearest 23.7 km
2 Cai Lan Port 63.4 km
3 Nghi Son Port 178.8 km
4 Vung Ang Port 310.6 km
5 Chan May Port 530.0 km
1 Nam Dinh River Port Nearest 58.6 km
2 Hanoi River Port 60.9 km
3 Ninh Binh River Port 84.0 km
4 Viet Tri River Port 118.7 km
5 Binh Duong River Port 1,099.1 km
1 Cat Bi Int. Airport Nearest 29.1 km
2 Noi Bai Int. Airport 77.3 km
3 Tho Xuan Airport (THD) 148.6 km
4 Vinh Airport (VII) 250.7 km
5 Dong Hoi Airport (VDH) 373.3 km
1 Hanoi - Hai Phong Expressway (CT03) Nearest 26.8 km
2 Hanoi - Bac Giang Expressway (CT05) 55.4 km
3 Ha Long - Hai Phong Expressway (CT10) 60.0 km
4 Hanoi - Thai Nguyen Expressway (CT02) 63.2 km
5 CT01 Expressway: Phap Van - Ninh Binh 70.1 km
1 Hai Phong Railway Station Nearest 24.8 km
2 Hanoi Railway Station 65.5 km
3 Vinh Railway Station 257.3 km
4 Dong Hoi Railway Station 376.7 km
5 Hue Railway Station 503.9 km
1 Hai Duong City Nearest 16.0 km
2 Hai Phong City 24.9 km
3 Hung Yen City 48.4 km
4 Bac Ninh City 52.4 km
5 Nam Dinh City 58.0 km
Straight-line distance is an estimate. Road distance is calculated from the available routing service.

Investment Decision Tools

Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.

CIT Tax Incentive

Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt 2 years
50% reduction 4 years
Total incentive 10 years
NĐ 218/2013/NĐ-CP

Minimum Wage Region Region 4

3.450.000 ₫/month
Hourly wage 16.600 ₫
Effective from 2024-07-01

Workforce & Education

Province population 4,664K people

Setup Cost Estimator Interactive

Reference data — based on IP land, power, water prices and regional minimum wage 4.

Login Log in to save calculation scenarios.

Data sources & verification

Data Source Last verified Status
Overview & legal Not provided Not verified Unverified
Prices & fees Not provided Not verified Unverified
Available land & occupancy Not provided Not verified Unverified
Infrastructure Not provided Not verified Unverified
Logistics Not provided Not verified Unverified

Industrial Park Transparency

Occupancy, price movements, and infrastructure status updated over time.

Recorded data

Price history chart

Quarterly rental price trends from aggregated market sources.

Loading data...

* Prices are indicative. Contact the industrial park management board for official quotations.

Ratings & Reviews (0)

Share practical feedback about infrastructure, service, pricing, and site experience.

0.0
0 reviews
5
0
4
0
3
0
2
0
1
0

Write a review

Guest reviews are moderated before publishing.

FAQ

Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.

VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.