VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.
500 ha Phase 3 expansion of Hiep Phuoc IP, riverside logistics and port-side industry.
Hiep Phuoc Industrial Park Phase 3 is the 500 ha expansion of the original Hiep Phuoc IP (in operation since 1996). Strategically located on the Soai Rap river with direct deep-water access, it specializes in logistics, port-side industry, food processing, and packaging.
Combined with Phase 1 and 2, total Hiep Phuoc cluster reaches ~2,000 ha — HCMC largest industrial cluster.
2x110 kV substations, total 2x40 MVA.
Hiep Phuoc water plant: 30,000 m³/day.
Central WWTP: 12,000 m³/day, Class A.
Standard HCMC IP incentives; logistics priority due to deep-water port access.
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
Reference data — based on IP land, power, water prices and regional minimum wage 4.
| Data | Source | Last verified | Status |
|---|---|---|---|
| Overview & legal | Not provided | Not verified | Unverified |
| Prices & fees | Not provided | Not verified | Unverified |
| Available land & occupancy | Not provided | Not verified | Unverified |
| Infrastructure | Not provided | Not verified | Unverified |
| Logistics | Not provided | Not verified | Unverified |
Occupancy, price movements, and infrastructure status updated over time.
Quarterly rental price trends from aggregated market sources.
* Prices are indicative. Contact the industrial park management board for official quotations.
Share practical feedback about infrastructure, service, pricing, and site experience.
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.