VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.
Mega 1,100 ha chemical-metallurgy IP, anchored by apatite, copper, and phosphorus complexes.
Tang Loong Industrial Park spans 1,100 ha in Bao Thang district, Lao Cai. It is one of Vietnam's largest chemical-metallurgy IPs, anchored by apatite mining (Vimico), copper smelting (Sin Quyen Copper Complex with TKV/Doosan), phosphorus and DAP fertilizer plants. Strategic for downstream processing of the rich mineral belt in Lao Cai/Yen Bai region.
220/110 kV substations, total capacity 2x125 MVA. Direct integration with Lao Cai hydropower grid.
Internal water plant: 25,000 m³/day with industrial treatment for mineral processing.
Specialized chemical-mineral WWTP: 18,000 m³/day, Class A QCVN.
Highest CIT incentives (Lao Cai economically disadvantaged). Mineral-processing value-chain priority.
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
Reference data — based on IP land, power, water prices and regional minimum wage 4.
| Data | Source | Last verified | Status |
|---|---|---|---|
| Overview & legal | Not provided | Not verified | Unverified |
| Prices & fees | Not provided | Not verified | Unverified |
| Available land & occupancy | Not provided | Not verified | Unverified |
| Infrastructure | Not provided | Not verified | Unverified |
| Logistics | Not provided | Not verified | Unverified |
Occupancy, price movements, and infrastructure status updated over time.
Quarterly rental price trends from aggregated market sources.
* Prices are indicative. Contact the industrial park management board for official quotations.
Share practical feedback about infrastructure, service, pricing, and site experience.
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.