Distance modeBy road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1
Nghi Son Port
Nearest
58.6 km
Not loaded
2
Vung Ang Port
117.7 km
Not loaded
3
Hai Phong Port
243.1 km
Not loaded
4
Cai Lan Port
271.6 km
Not loaded
5
Chan May Port
372.4 km
Not loaded
1
Ninh Binh River Port
Nearest
156.4 km
Not loaded
2
Nam Dinh River Port
177.7 km
Not loaded
3
Hanoi River Port
233.2 km
Not loaded
4
Viet Tri River Port
271.7 km
Not loaded
5
Binh Duong River Port
883.0 km
Not loaded
1
Vinh Airport (VII)
Nearest
16.1 km
Not loaded
2
Tho Xuan Airport (THD)
117.1 km
Not loaded
3
Dong Hoi Airport (VDH)
177.1 km
Not loaded
4
Cat Bi Int. Airport
240.5 km
Not loaded
5
Noi Bai Int. Airport
261.1 km
Not loaded
1
CT01 Expressway: Dien Chau - Vung Ang
Nearest
53.3 km
Not loaded
2
CT01 Expressway: Thanh Hoa - Dien Chau
58.4 km
Not loaded
3
CT01 Expressway: Ninh Binh - Thanh Hoa
136.9 km
Not loaded
4
CT01 Expressway: Phap Van - Ninh Binh
183.8 km
Not loaded
5
CT01 Expressway: Bung - Van Ninh
186.1 km
Not loaded
1
Vinh Railway Station
Nearest
22.8 km
Not loaded
2
Dong Hoi Railway Station
180.2 km
Not loaded
3
Hanoi Railway Station
239.4 km
Not loaded
4
Hai Phong Railway Station
242.9 km
Not loaded
5
Hue Railway Station
333.0 km
Not loaded
1
Vinh City
Nearest
22.1 km
Not loaded
2
Ha Tinh City
62.5 km
Not loaded
3
Ninh Binh City
155.7 km
Not loaded
4
Nam Dinh City
178.1 km
Not loaded
5
Dong Hoi City
180.7 km
Not loaded
Straight-line distance is an estimate. Road distance is calculated from the available routing service.
Investment Decision Tools
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
CIT Tax Incentive
Tax rate
10%
Ưu đãi thuế Khu Công Nghệ Cao
100% exempt4 years
50% reduction9 years
Total incentive15 years
NĐ 218/2013/NĐ-CP
Minimum Wage Region Region 4
3.450.000 ₫/month
Hourly wage16.600 ₫
Effective from2024-07-01
Workforce & Education
Province population3,832K people
Setup Cost Estimator Interactive
Reference data — based on IP land, power, water prices and regional minimum wage 4.
Occupancy, price movements, and infrastructure status updated over time.
Recorded data
Occupancy rate
0.0%
Land available
0.0 ha
Leased
2,000.0 ha
Available
Recent trend
Updated: 01/05/2026
Price history chart
Quarterly rental price trends from aggregated market sources.
Loading data...
No price history is available for this type.
* Prices are indicative. Contact the industrial park management board for official quotations.
Ratings & Reviews (0)
Share practical feedback about infrastructure, service, pricing, and site experience.
0.0
0 reviews
5
0
4
0
3
0
2
0
1
0
Write a review
FAQ
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.
Investors should review land availability, lease term, infrastructure readiness, utilities, workforce access, logistics distance, management support, and applicable investment incentives before making a site visit or reservation.
Straight-line distance is estimated from map coordinates. Road distance is calculated through the routing service when you switch the Logistics Distance mode to By road.
Yes. Use the Contact / Send inquiry form on this page and include your required land area, factory size, industry, timeline, and preferred contact method.
Typical documents include company profile, proposed project scope, investment capital, land or factory demand, environmental requirements, and expected implementation schedule.
Contact / Send inquiry
Send your requirements to the industrial park team. We will route the message with the selected purpose and project details.
Login
Select Location
Filter products by location
Product successfully added to your cart!
VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.