Thai Binh EZ, Hung Yen Province (former Thai Binh)
About / Location
IP located in Hung Yen area, Hung Yen Province (after Thai Binh merger).
Infrastructure
Traffic
Near QL5/QL10/HN–HP expressway; convenient links to Hanoi, Hai Phong port and Noi Bai airport.
Power supply
Power supply via 22/35kV national grid (EVN North); backup substations ensuring ≥99.9% reliability.
Water supply
Clean water from regional waterworks, 5,000–20,000 m³/day, QCVN 01:2009/BYT compliant.
Wastewater treatment
Centralised wastewater treatment plant, 5,000–15,000 m³/day, QCVN 40:2011/BTNMT column A.
Internet
Full FTTH fibre coverage; VNPT/Viettel/FPT/CMC services; ≥1Gbps for enterprise tenants; redundant international links.
Policies & Services
Policies
CIT incentive: 10% for 15 years, 4-year exemption + 50% reduction for 9 more years. 11-year land rent exemption. IPs inside Thai Binh EZ receive additional special incentives.
Distance modeBy road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1
Hai Phong Port
Nearest
28.8 km
Not loaded
2
Cai Lan Port
58.7 km
Not loaded
3
Nghi Son Port
163.3 km
Not loaded
4
Vung Ang Port
282.4 km
Not loaded
5
Chan May Port
496.4 km
Not loaded
1
Nam Dinh River Port
Nearest
54.1 km
Not loaded
2
Ninh Binh River Port
79.7 km
Not loaded
3
Hanoi River Port
89.1 km
Not loaded
4
Viet Tri River Port
149.7 km
Not loaded
5
Binh Duong River Port
1,069.9 km
Not loaded
1
Cat Bi Int. Airport
Nearest
24.9 km
Not loaded
2
Noi Bai Int. Airport
110.0 km
Not loaded
3
Tho Xuan Airport (THD)
145.5 km
Not loaded
4
Vinh Airport (VII)
231.6 km
Not loaded
5
Dong Hoi Airport (VDH)
344.2 km
Not loaded
1
Ha Long - Hai Phong Expressway (CT10)
Nearest
55.5 km
Not loaded
2
Hanoi - Hai Phong Expressway (CT03)
57.9 km
Not loaded
3
CT01 Expressway: Phap Van - Ninh Binh
78.7 km
Not loaded
4
Ha Long - Van Don Expressway (CT11)
84.3 km
Not loaded
5
Hanoi - Bac Giang Expressway (CT05)
90.0 km
Not loaded
1
Hai Phong Railway Station
Nearest
28.2 km
Not loaded
2
Hanoi Railway Station
95.0 km
Not loaded
3
Vinh Railway Station
237.9 km
Not loaded
4
Dong Hoi Railway Station
347.6 km
Not loaded
5
Hue Railway Station
471.3 km
Not loaded
1
Hai Phong City
Nearest
26.6 km
Not loaded
2
Hai Duong City
49.7 km
Not loaded
3
Nam Dinh City
53.5 km
Not loaded
4
Ha Long City
59.8 km
Not loaded
5
Hung Yen City
61.4 km
Not loaded
Straight-line distance is an estimate. Road distance is calculated from the available routing service.
Investment Decision Tools
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
CIT Tax Incentive
Tax rate
10%
Địa bàn KT-XH đặc biệt khó khăn
100% exempt4 years
50% reduction9 years
Total incentive15 years
NĐ 218/2013/NĐ-CP
Minimum Wage Region Region 4
3.450.000 ₫/month
Hourly wage16.600 ₫
Effective from2024-07-01
Workforce & Education
Province population3,568K people
Setup Cost Estimator Interactive
Reference data — based on IP land, power, water prices and regional minimum wage 4.
Occupancy, price movements, and infrastructure status updated over time.
Recorded data
Price history chart
Quarterly rental price trends from aggregated market sources.
Loading data...
No price history is available for this type.
* Prices are indicative. Contact the industrial park management board for official quotations.
Ratings & Reviews (0)
Share practical feedback about infrastructure, service, pricing, and site experience.
0.0
0 reviews
5
0
4
0
3
0
2
0
1
0
Write a review
FAQ
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.
Investors should review land availability, lease term, infrastructure readiness, utilities, workforce access, logistics distance, management support, and applicable investment incentives before making a site visit or reservation.
Straight-line distance is estimated from map coordinates. Road distance is calculated through the routing service when you switch the Logistics Distance mode to By road.
Yes. Use the Contact / Send inquiry form on this page and include your required land area, factory size, industry, timeline, and preferred contact method.
Typical documents include company profile, proposed project scope, investment capital, land or factory demand, environmental requirements, and expected implementation schedule.
Contact / Send inquiry
Send your requirements to the industrial park team. We will route the message with the selected purpose and project details.
Login
Select Location
Filter products by location
Product successfully added to your cart!
VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.