An Dien – An Tay Communes, Ben Cat Dist., Binh Duong Province
Infrastructure
Geology
Hard soil, compression ratio: 2Kg/cm2
Traffic
Width: 20m, 24m
Number of lanes: 2 lanes
Power supply
22 Kv
Capacity: 70 MVA
Water supply
Capacity: 14.000 m3/day
Wastewater treatment
Capacity: 6000 m3/day
Communication
Advantage
Internet
ADSL
Pricing
Land rental
Land payment terms
Payment Term: 3 instalments as follows,
+ The 1st instalment: 50% of the total, payable right after the land subleasing contract is signed (deduction of the deposit).
+ The 2nd instalment: 40% of the total, payablewithin 6 months as of the day when the land subleasing contract is signed.
+ The 3rd instalment: 10% of the total, payable within 12 months as of the day when the land subleasing contract is signed.
Factory / Workshop
N/A
Power tariff
Above prices not included VAT
Water tariff
Not included VAT
Wastewater fee
Not included VAT
Service charges
Twice a year
Policies & Services
Policies
Investors shall be fully assisted in investment procedures to execute swiftly their project in Rach Bap – An Dien Industrial Park.
Services
* Free Services:
1. Consulting on procedures, dossiers for investment certificate. Assisting investors in submitting dossiers for investment certificate and receiving investment certificate for investors;
2. Registration for tax code, import-export code and stamp;
3. Consulting on selection of contractors for plant construction and electrical installation;
4. Assisting investors in signing contracts with telecommunications and electricity supplying companies.
Distance modeBy road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1
Saigon Port
Nearest
44.9 km
Not loaded
2
Cat Lai Port
48.9 km
Not loaded
3
Phu My Port
81.9 km
Not loaded
4
Cai Mep Port
85.5 km
Not loaded
5
Vung Tau Port
106.1 km
Not loaded
1
Binh Duong River Port
Nearest
21.9 km
Not loaded
2
Long Binh Tan River Port
45.0 km
Not loaded
3
Dong Nai River Port
55.2 km
Not loaded
4
My Tho River Port
87.8 km
Not loaded
5
Vinh Long River Port
115.6 km
Not loaded
1
Tan Son Nhat Int. Airport
Nearest
37.4 km
Not loaded
2
Long Thanh Airport (future)
65.5 km
Not loaded
3
Can Tho Int. Airport (VCA)
147.3 km
Not loaded
4
Rach Gia Airport (VKG)
201.6 km
Not loaded
5
Lien Khuong Airport (DLI)
211.0 km
Not loaded
1
HCM - Chon Thanh Expressway (CT17)
Nearest
18.0 km
Not loaded
2
Ben Luc - Long Thanh Expressway (CT16)
47.6 km
Not loaded
3
HCM - Moc Bai Expressway (CT18)
47.7 km
Not loaded
4
Long Thanh - Dau Giay Expressway (CT25)
59.7 km
Not loaded
5
HCM - Trung Luong Expressway (CT15)
60.6 km
Not loaded
1
Bien Hoa Railway Station
Nearest
37.5 km
Not loaded
2
Saigon Railway Station
42.0 km
Not loaded
3
Nha Trang Railway Station
314.5 km
Not loaded
4
Da Nang Railway Station
578.0 km
Not loaded
5
Hue Railway Station
604.0 km
Not loaded
1
Thu Dau Mot City
Nearest
21.2 km
Not loaded
2
Bien Hoa City
38.7 km
Not loaded
3
HCMC Center
43.5 km
Not loaded
4
Tan An City
68.1 km
Not loaded
5
My Tho City
88.7 km
Not loaded
Straight-line distance is an estimate. Road distance is calculated from the available routing service.
Investment Decision Tools
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
CIT Tax Incentive
Tax rate
17%
Ưu đãi tại Bình Dương – VSIP
100% exempt2 years
50% reduction4 years
Total incentive10 years
NĐ 218/2013/NĐ-CP
Minimum Wage Region Region 4
3.450.000 ₫/month
Hourly wage16.600 ₫
Effective from2024-07-01
Workforce & Education
Province population14,003K people
Setup Cost Estimator Interactive
Reference data — based on IP land, power, water prices and regional minimum wage 4.
Occupancy, price movements, and infrastructure status updated over time.
Recorded data
Price history chart
Quarterly rental price trends from aggregated market sources.
Loading data...
No price history is available for this type.
* Prices are indicative. Contact the industrial park management board for official quotations.
Ratings & Reviews (0)
Share practical feedback about infrastructure, service, pricing, and site experience.
0.0
0 reviews
5
0
4
0
3
0
2
0
1
0
Write a review
FAQ
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.
Investors should review land availability, lease term, infrastructure readiness, utilities, workforce access, logistics distance, management support, and applicable investment incentives before making a site visit or reservation.
Straight-line distance is estimated from map coordinates. Road distance is calculated through the routing service when you switch the Logistics Distance mode to By road.
Yes. Use the Contact / Send inquiry form on this page and include your required land area, factory size, industry, timeline, and preferred contact method.
Typical documents include company profile, proposed project scope, investment capital, land or factory demand, environmental requirements, and expected implementation schedule.
Contact / Send inquiry
Send your requirements to the industrial park team. We will route the message with the selected purpose and project details.
Login
Select Location
Filter products by location
Product successfully added to your cart!
VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.