IP located in Hung Yen area, Hung Yen Province (after Thai Binh merger).
Infrastructure
Traffic
Near QL5/QL10/HN–HP expressway; convenient links to Hanoi, Hai Phong port and Noi Bai airport.
Power supply
Power supply via 22/35kV national grid (EVN North); backup substations ensuring ≥99.9% reliability.
Water supply
Clean water from regional waterworks, 5,000–20,000 m³/day, QCVN 01:2009/BYT compliant.
Wastewater treatment
Centralised wastewater treatment plant, 5,000–15,000 m³/day, QCVN 40:2011/BTNMT column A.
Internet
Full FTTH fibre coverage; VNPT/Viettel/FPT/CMC services; ≥1Gbps for enterprise tenants; redundant international links.
Policies & Services
Policies
CIT incentive: 10% for 15 years, 4-year exemption + 50% reduction for 9 more years. 11-year land rent exemption. IPs inside Thai Binh EZ receive additional special incentives.
Distance modeBy road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1
Hai Phong Port
Nearest
62.6 km
Not loaded
2
Cai Lan Port
102.6 km
Not loaded
3
Nghi Son Port
159.3 km
Not loaded
4
Vung Ang Port
305.3 km
Not loaded
5
Chan May Port
536.2 km
Not loaded
1
Hanoi River Port
Nearest
28.5 km
Not loaded
2
Nam Dinh River Port
43.4 km
Not loaded
3
Ninh Binh River Port
60.9 km
Not loaded
4
Viet Tri River Port
89.7 km
Not loaded
5
Binh Duong River Port
1,092.9 km
Not loaded
1
Noi Bai Int. Airport
Nearest
54.7 km
Not loaded
2
Cat Bi Int. Airport
67.0 km
Not loaded
3
Tho Xuan Airport (THD)
118.5 km
Not loaded
4
Vinh Airport (VII)
233.3 km
Not loaded
5
Dong Hoi Airport (VDH)
369.2 km
Not loaded
1
Hanoi - Hai Phong Expressway (CT03)
Nearest
19.0 km
Not loaded
2
CT01 Expressway: Phap Van - Ninh Binh
36.9 km
Not loaded
3
Hanoi - Hoa Binh Expressway (CT07)
38.0 km
Not loaded
4
Hanoi - Thai Nguyen Expressway (CT02)
42.3 km
Not loaded
5
Hanoi - Bac Giang Expressway (CT05)
46.7 km
Not loaded
1
Hanoi Railway Station
Nearest
35.2 km
Not loaded
2
Hai Phong Railway Station
63.5 km
Not loaded
3
Vinh Railway Station
240.2 km
Not loaded
4
Dong Hoi Railway Station
372.6 km
Not loaded
5
Hue Railway Station
507.2 km
Not loaded
1
Hung Yen City
Nearest
17.3 km
Not loaded
2
Hai Duong City
28.7 km
Not loaded
3
Hanoi Center
34.6 km
Not loaded
4
Bac Ninh City
42.9 km
Not loaded
5
Nam Dinh City
43.2 km
Not loaded
Straight-line distance is an estimate. Road distance is calculated from the available routing service.
Investment Decision Tools
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
CIT Tax Incentive
Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt2 years
50% reduction4 years
Total incentive10 years
NĐ 218/2013/NĐ-CP
Minimum Wage Region Region 4
3.450.000 ₫/month
Hourly wage16.600 ₫
Effective from2024-07-01
Workforce & Education
Province population3,568K people
Setup Cost Estimator Interactive
Reference data — based on IP land, power, water prices and regional minimum wage 4.
Occupancy, price movements, and infrastructure status updated over time.
Recorded data
Price history chart
Quarterly rental price trends from aggregated market sources.
Loading data...
No price history is available for this type.
* Prices are indicative. Contact the industrial park management board for official quotations.
Ratings & Reviews (0)
Share practical feedback about infrastructure, service, pricing, and site experience.
0.0
0 reviews
5
0
4
0
3
0
2
0
1
0
Write a review
FAQ
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.
Investors should review land availability, lease term, infrastructure readiness, utilities, workforce access, logistics distance, management support, and applicable investment incentives before making a site visit or reservation.
Straight-line distance is estimated from map coordinates. Road distance is calculated through the routing service when you switch the Logistics Distance mode to By road.
Yes. Use the Contact / Send inquiry form on this page and include your required land area, factory size, industry, timeline, and preferred contact method.
Typical documents include company profile, proposed project scope, investment capital, land or factory demand, environmental requirements, and expected implementation schedule.
Contact / Send inquiry
Send your requirements to the industrial park team. We will route the message with the selected purpose and project details.
Login
Select Location
Filter products by location
Product successfully added to your cart!
VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.