Suoi Tre Industrial Zone, Suoi Tre and Bao Vinh commune, Long Khanh town, Dong Nai province
Infrastructure
Geology
Hard and stable ground, cost-saving construction of the foundation, the average compressive strength of 1.8 kg/cm2.
Traffic
Main road Cua Heo Binh Loc with width 45m
Power supply
Supply from the national gridline by Long Khanh Electricity through 22KV transmission line and 110/22KV 2x40MVA transformer station
+ Electricity charge: price offered by Electricity Company of Vietnam for voltage from 22KV to 110 KV:
- Rush hour (18:00 – 22:00) : VND 1,938 /kWh
- Off peak (22:00 – 06:00) : VND 589 /kWh
- Normal (06:00 – 18:00) : VND 1,023 /kWh
(Prices are exclusive of VAT)
+ Monthly payment
Water supply
3,000 m3/day
Wastewater treatment
Wastewater treatment plant with maximum capacity of 5,000 m3/day (the first stage: 1,000 m3/day)
- Wastewater need treated: both sanitary and industrial wastewater
- Chargeable volume is counted at 80% of supplied water volume
- Treatment fee to meet the allowable limits of standards (attached): VND 6,731 /m3
- Standard of water released from the I.Z: QCVN 40:2011/BTNMT
Note:
- The above price is only valid at the time of posting (2013).
- All of charges above are not inclusive of VAT.
- Monthly payment.
Internet
ADSL line in Industrial Zone
Pricing
Land rental
+ The rent can be negotiated
Land payment terms
One time payment or Annual payment
Factory / Workshop
+ The rent can be negotiated
Power tariff
+ Charged by EVN
Water tariff
+ Charged by Gov. suppliers
Wastewater fee
+ Land using fee will be changed in accordance with state.
Service charges
+ Payment every year
Policies & Services
Policies
After signing Land Sublease Contract, SZA will support and provide necessary procedures and information for investors as follows:
* Be supported investor to comleted investment procedures as soonest
* Preferential policies
* Labour cost
* Human resource
* Transportation cost by road, seaway and airway
* The list of carriers
* Service suppliers
* Contractors
Distance modeBy road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1
Phu My Port
Nearest
46.8 km
Not loaded
2
Cai Mep Port
50.1 km
Not loaded
3
Cat Lai Port
53.2 km
Not loaded
4
Saigon Port
61.6 km
Not loaded
5
Vung Tau Port
69.5 km
Not loaded
1
Dong Nai River Port
Nearest
25.7 km
Not loaded
2
Long Binh Tan River Port
37.2 km
Not loaded
3
Binh Duong River Port
61.8 km
Not loaded
4
My Tho River Port
116.2 km
Not loaded
5
Vinh Long River Port
158.6 km
Not loaded
1
Long Thanh Airport (future)
Nearest
27.5 km
Not loaded
2
Tan Son Nhat Int. Airport
64.9 km
Not loaded
3
Lien Khuong Airport (DLI)
151.8 km
Not loaded
4
Can Tho Int. Airport (VCA)
192.6 km
Not loaded
5
Buon Ma Thuot Airport (BMV)
213.6 km
Not loaded
1
Long Thanh - Dau Giay Expressway (CT25)
Nearest
20.4 km
Not loaded
2
Bien Hoa - Vung Tau Expressway (CT19)
28.4 km
Not loaded
3
CT01 Expressway: Phan Thiet - Dau Giay
51.7 km
Not loaded
4
Ben Luc - Long Thanh Expressway (CT16)
57.3 km
Not loaded
5
HCM - Chon Thanh Expressway (CT17)
72.0 km
Not loaded
1
Bien Hoa Railway Station
Nearest
44.8 km
Not loaded
2
Saigon Railway Station
64.0 km
Not loaded
3
Nha Trang Railway Station
257.1 km
Not loaded
4
Da Nang Railway Station
578.6 km
Not loaded
5
Hue Railway Station
614.5 km
Not loaded
1
Bien Hoa City
Nearest
43.0 km
Not loaded
2
Vung Tau City
61.2 km
Not loaded
3
HCMC Center
61.7 km
Not loaded
4
Thu Dau Mot City
63.9 km
Not loaded
5
Phan Thiet City
94.5 km
Not loaded
Straight-line distance is an estimate. Road distance is calculated from the available routing service.
Investment Decision Tools
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
CIT Tax Incentive
Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt2 years
50% reduction4 years
Total incentive10 years
NĐ 218/2013/NĐ-CP
Minimum Wage Region Region 4
3.450.000 ₫/month
Hourly wage16.600 ₫
Effective from2024-07-01
Workforce & Education
Province population4,491K people
Setup Cost Estimator Interactive
Reference data — based on IP land, power, water prices and regional minimum wage 4.
Occupancy, price movements, and infrastructure status updated over time.
Recorded data
Price history chart
Quarterly rental price trends from aggregated market sources.
Loading data...
No price history is available for this type.
* Prices are indicative. Contact the industrial park management board for official quotations.
Ratings & Reviews (0)
Share practical feedback about infrastructure, service, pricing, and site experience.
0.0
0 reviews
5
0
4
0
3
0
2
0
1
0
Write a review
FAQ
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.
Investors should review land availability, lease term, infrastructure readiness, utilities, workforce access, logistics distance, management support, and applicable investment incentives before making a site visit or reservation.
Straight-line distance is estimated from map coordinates. Road distance is calculated through the routing service when you switch the Logistics Distance mode to By road.
Yes. Use the Contact / Send inquiry form on this page and include your required land area, factory size, industry, timeline, and preferred contact method.
Typical documents include company profile, proposed project scope, investment capital, land or factory demand, environmental requirements, and expected implementation schedule.
Contact / Send inquiry
Send your requirements to the industrial park team. We will route the message with the selected purpose and project details.
Login
Select Location
Filter products by location
Product successfully added to your cart!
VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.