VIIPIP Vietnam Industrial Parks
English
English Vietnamese

Tam Thăng 2

Da Nang City Industrial Park (Data) Công ty CPĐTCapella Quảng Nam (Capella Land) 0906306559 [email protected]
Total area
103 ha
Land available
80.8 ha
Land price
25 USD/m²
Occupancy rate22%
22 / 103 ha leased · 81 ha available
Land rate lower than province avg 40% (Prov. avg: 41.4)
🗺️ Province investment snapshot: Da Nang City
View full profile →
3,066K
Population
11,860
km²

Overview

Address

KCN Tam Thăng 2, huyện Thăng Bình, tỉnh Quảng Nam

About / Location

 

Infrastructure

Geology

Land is filled up and compacted to meet K = 0.9

Traffic

Tam Thang 2 IP is designed and constructed with standard road system, ensuring convenient transportation of means. Main road is 30m; Access road is 22m.

Power supply

 22 kV

Water supply

 25.000m3/day

Wastewater treatment

Collecting and treatment system of wastewater to meet A level. Capacity of 2.000m3/day and it is increasable according to the actual requirement.

B/ QCVN 40-2011

Communication

 Available

Internet

 ADSL, Fiber

Pricing

Land rental

Raw land leasing fee paying for Government is exempted for 14 years counting from 2016.

Policies & Services

Investment process

 Investment-Process

Policies

The highest tax incentives appliable for Chu Lai Open Economic Zone: Tax rate 10 appliable for 15 years; 4 years Tax Holiday; 9 years Reduction of 50%; Ruduction of 50% Personal Income Tax.

Free support of Investment Procedures (IRC, BRC, Tax Code)

Project Location & Nearby

Searching within 5 km radius
Loading data…

Logistics Distance

Distance mode By road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1 Dung Quat Port Nearest 44.7 km
2 Da Nang Port 60.0 km
3 Chan May Port 93.4 km
4 Quy Nhon Port 222.5 km
5 Vung Ang Port 347.1 km
1 Dong Nai River Port Nearest 543.5 km
2 Long Binh Tan River Port 547.3 km
3 Binh Duong River Port 549.8 km
4 Ninh Binh River Port 579.6 km
5 Nam Dinh River Port 586.4 km
1 Chu Lai Airport (VCL) Nearest 35.6 km
2 Da Nang Int. Airport 55.0 km
3 Phu Bai Int. Airport (HUI) 118.9 km
4 Pleiku Airport (PXU) 185.4 km
5 Phu Cat Airport (UIH) 195.1 km
1 Da Nang - Quang Ngai Expressway (CT13) Nearest 18.5 km
2 CT01 Expressway: La Son - Tuy Loan 84.7 km
3 CT01 Expressway: Quang Ngai - Binh Dinh 112.4 km
4 CT01 Expressway: Cam Lo - La Son 180.5 km
5 CT01 Expressway: Bung - Van Ninh 284.1 km
1 Da Nang Railway Station Nearest 56.4 km
2 Hue Railway Station 132.7 km
3 Dong Hoi Railway Station 287.4 km
4 Nha Trang Railway Station 382.1 km
5 Vinh Railway Station 450.9 km
1 Tam Ky City Nearest 5.1 km
2 Hoi An City 32.0 km
3 Da Nang Center 55.9 km
4 Quang Ngai City 66.4 km
5 Hue City 132.2 km
Straight-line distance is an estimate. Road distance is calculated from the available routing service.

Investment Decision Tools

Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.

CIT Tax Incentive

Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt 2 years
50% reduction 4 years
Total incentive 10 years
NĐ 218/2013/NĐ-CP

Minimum Wage Region Region 4

3.450.000 ₫/month
Hourly wage 16.600 ₫
Effective from 2024-07-01

Workforce & Education

Province population 3,066K people

Setup Cost Estimator Interactive

Reference data — based on IP land, power, water prices and regional minimum wage 4.

Login Log in to save calculation scenarios.

Data sources & verification

Data Source Last verified Status
Overview & legal Not provided Not verified Unverified
Prices & fees Not provided Not verified Unverified
Available land & occupancy Not provided Not verified Unverified
Infrastructure Not provided Not verified Unverified
Logistics Not provided Not verified Unverified

Industrial Park Transparency

Occupancy, price movements, and infrastructure status updated over time.

Recorded data

Price history chart

Quarterly rental price trends from aggregated market sources.

Loading data...

* Prices are indicative. Contact the industrial park management board for official quotations.

Ratings & Reviews (0)

Share practical feedback about infrastructure, service, pricing, and site experience.

0.0
0 reviews
5
0
4
0
3
0
2
0
1
0

Write a review

Guest reviews are moderated before publishing.

FAQ

Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.

VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.