TTZ is located in District 7, the southeast corner of Ho Chi Minh Citys current city center. It is on a penisular surrounded by the Saigon River, with a total area of 300 hectares.
Infrastructure
Geology
+ Hard soil
Traffic
+ Width: 30m
+ Number of lanes : 6 lanes
Power supply
+ 22KV medium voltage lines
Water supply
+ Capacity: 35.000m3/day
Wastewater treatment
+ Capacity: 10.000m3/day
+ Waste water from factories within the zone, after treated by each company, is collected into the waste water treatment palnt through public pipelines for treatment before being discharged into the river.
Communication
+ Installed in accordance with the Leasee’s requirement
Internet
+ ADSL high speed line
Pricing
Land rental
USD 16/m2/month
40 - 50 years
Land payment terms
+wire-transfer via Vietcombank
Factory / Workshop
6 USD/m2/month
In effort of meeting the demand for available factory, TTC is executing the construction of a 6-fllor standard factory at the road No.14. The factory includes 12 units, 2 units a floor with 1,000 m2 per each in total 12,000 m2. The lift system is equipped and professional management system is employed for the whole building.
Power tariff
+ Charged by EVN
+ reserve water purification plant inside the zone
Water tariff
+ Charged by Gov. suppliers
+ 35.000 m3 per day
Wastewater fee
+ N/A
Service charges
+ Monthly
Other fees
+ N/A
Policies & Services
Policies
* VAT: 0%
* Duty-free import of machinery, equipment and raw materials.
* Free duty for the products to export.
* No remittance tax for profits repatriated.
Services
telecommunications, waste water treatment plant, fire station, warehousing and transportation centre, bonded warehouse, clinic, bank, dormitory, employee training and recreation center, standard factory, incubation center
Distance modeBy road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1
Saigon Port
Nearest
2.8 km
Not loaded
2
Cat Lai Port
6.8 km
Not loaded
3
Phu My Port
38.4 km
Not loaded
4
Cai Mep Port
41.3 km
Not loaded
5
Vung Tau Port
59.7 km
Not loaded
1
Binh Duong River Port
Nearest
26.9 km
Not loaded
2
Long Binh Tan River Port
27.4 km
Not loaded
3
Dong Nai River Port
36.4 km
Not loaded
4
My Tho River Port
59.1 km
Not loaded
5
Vinh Long River Port
99.5 km
Not loaded
1
Tan Son Nhat Int. Airport
Nearest
10.6 km
Not loaded
2
Long Thanh Airport (future)
34.0 km
Not loaded
3
Can Tho Int. Airport (VCA)
133.6 km
Not loaded
4
Rach Gia Airport (VKG)
195.6 km
Not loaded
5
Lien Khuong Airport (DLI)
210.4 km
Not loaded
1
Ben Luc - Long Thanh Expressway (CT16)
Nearest
2.6 km
Not loaded
2
Long Thanh - Dau Giay Expressway (CT25)
41.5 km
Not loaded
3
HCM - Trung Luong Expressway (CT15)
43.8 km
Not loaded
4
Bien Hoa - Vung Tau Expressway (CT19)
51.9 km
Not loaded
5
HCM - Chon Thanh Expressway (CT17)
56.0 km
Not loaded
1
Saigon Railway Station
Nearest
6.4 km
Not loaded
2
Bien Hoa Railway Station
24.7 km
Not loaded
3
Nha Trang Railway Station
315.8 km
Not loaded
4
Da Nang Railway Station
612.6 km
Not loaded
5
Hue Railway Station
642.4 km
Not loaded
1
HCMC Center
Nearest
4.0 km
Not loaded
2
Bien Hoa City
26.0 km
Not loaded
3
Thu Dau Mot City
26.7 km
Not loaded
4
Tan An City
42.1 km
Not loaded
5
Vung Tau City
58.6 km
Not loaded
Straight-line distance is an estimate. Road distance is calculated from the available routing service.
Investment Decision Tools
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
CIT Tax Incentive
Tax rate
10%
Ưu đãi thuế Khu Chế Xuất
100% exempt4 years
50% reduction9 years
Total incentive15 years
NĐ 218/2013/NĐ-CP, NĐ 82/2018/NĐ-CP
Minimum Wage Region Region 4
3.450.000 ₫/month
Hourly wage16.600 ₫
Effective from2024-07-01
Workforce & Education
Province population14,003K people
Setup Cost Estimator Interactive
Reference data — based on IP land, power, water prices and regional minimum wage 4.
Occupancy, price movements, and infrastructure status updated over time.
Recorded data
Price history chart
Quarterly rental price trends from aggregated market sources.
Loading data...
No price history is available for this type.
* Prices are indicative. Contact the industrial park management board for official quotations.
Ratings & Reviews (0)
Share practical feedback about infrastructure, service, pricing, and site experience.
0.0
0 reviews
5
0
4
0
3
0
2
0
1
0
Write a review
FAQ
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.
Investors should review land availability, lease term, infrastructure readiness, utilities, workforce access, logistics distance, management support, and applicable investment incentives before making a site visit or reservation.
Straight-line distance is estimated from map coordinates. Road distance is calculated through the routing service when you switch the Logistics Distance mode to By road.
Yes. Use the Contact / Send inquiry form on this page and include your required land area, factory size, industry, timeline, and preferred contact method.
Typical documents include company profile, proposed project scope, investment capital, land or factory demand, environmental requirements, and expected implementation schedule.
Contact / Send inquiry
Send your requirements to the industrial park team. We will route the message with the selected purpose and project details.
Login
Select Location
Filter products by location
Product successfully added to your cart!
VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.