TIEN SON INDUSTRIAL PARK
Location: Tien Son and Tien Du District, Bac Ninh Province, Vietnam.
TIEN SON INDUSTRIAL PARK
Location: Tien Son and Tien Du District, Bac Ninh Province, Vietnam.
– from Hanoi capital: 22km (30’)
– far from Noi Bai International Airport: 35km (40’)
– far from Hai Phong deep seaport: 110km (1h55’)
– far from Cai Lan deep seaport (Quang Ninh): 120km (2h30’)
– far from Lang Son international border gate (China): 120km (2h50’)

– Internal traffic system covers 15% total IP area, including main road with 2 lines of 37m wide and 28m wide lanes.
– Tien Son Industrial Park is linked tonational road No. 1B by 4 geometry across points and 2 fly-over bridges.
– Traffic routes inside Industrial Parks are planned in square pattern, facilitating the entering into building areas.
Power is supplied from national grid through 110/22KV (35KV) transformer station with capacity of 1x40MVA and 1 x 63 MVA.
Water supply
Water treatment station with first phase capacity of 7,000m3/day. (The diameter of water supply pipe is D100 mm – D300mm)
Drainage system
Rain water drainage system separate to waste water drainage system. The drainage pipe diameter is D1,000 mm – D1,250 mm with the principle of automatic drainage.
– Waste water treatment station with the first phase capacity is 4,000 m3/day. (Industry waste water is calculated by 80% of water supply volume).
– The waste water drainage pipe is D300mm – D750mm
– Waste from factories in the IP shall be categorized immediately in all factory and be collected to the centered treatment area of Bac Ninh Province.
– Telecommunication system reach the international standard
– Underground cable system is connected directly to the fence of every factory.

– Taxation of corporate income tax rate is 20 %
Free of tax for the oversea remittance.
Exemption of VAT on goods which include imported raw marterials for producing, processing of exported goods according to the processing contracts signed with foreign Partners.
(1) – Import tax exemption for goods to create fixed assets
(2) – Exemption for import raw material, imported materials to produce exported goods.
(3) – Exemption for import raw material, to manufacture on the list of special incentive investment project in 5 years commencing from manufacturing start (If Enterprises invest in the list of special incentive investment project or invest in spare parts manufacture, or mechanic, electronic..
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
Reference data — based on IP land, power, water prices and regional minimum wage 4.
| Data | Source | Last verified | Status |
|---|---|---|---|
| Overview & legal | Not provided | Not verified | Unverified |
| Prices & fees | Not provided | Not verified | Unverified |
| Available land & occupancy | Not provided | Not verified | Unverified |
| Infrastructure | Not provided | Not verified | Unverified |
| Logistics | Not provided | Not verified | Unverified |
Occupancy, price movements, and infrastructure status updated over time.
Quarterly rental price trends from aggregated market sources.
* Prices are indicative. Contact the industrial park management board for official quotations.
Share practical feedback about infrastructure, service, pricing, and site experience.
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.