Hai Phong Industrial Park (Data) Công ty CP Khu Công Nghiệp Sài Gòn – Hải Phòng https://saigonhaiphong.com.vn +84 225 3614 999 [email protected]

Trang Due IP — 600ha in An Duong; main manufacturing cluster of LG Group in Vietnam.

Total area
600 ha
Land available
165 ha
Factory available
10 m²
Land price
95 USD/m²
Occupancy rate73%
435 / 600 ha leased · 165 ha available
Land rate higher than province avg 21% (Prov. avg: 78.4)
🗺️ Province investment snapshot: Hai Phong
View full profile →
4,664K
Population
7.1M
Income/mo
70.2
PCI
$29.8B
FDI stock
217
Wards
3,195
km²
0km
To port

Overview

Address

Le Loi Commune, An Dương District, Hải Phòng

About / Location

An Duong district, Hai Phong City. 15km from city centre, 18km from Cat Bi airport, 18km from Hai Phong port.

Infrastructure

Traffic

On QL10; Cat Bi airport 18km; Hai Phong port 18km; HN-HP expressway 5km.

Power supply

Power supply via 22/35kV national grid (EVN Hai Phong); multiple backup substations ensuring 99.9% reliability.

Water supply

Clean water from regional waterworks (An Duong / Cau Nguyet), capacity 5,000–20,000 m³/day, QCVN 01:2009/BYT compliant.

Wastewater treatment

Centralised wastewater treatment plant, capacity 5,000–15,000 m³/day, treated to QCVN 40:2011/BTNMT column A.

Internet

Full FTTH fibre-optic coverage; VNPT/Viettel/FPT/CMC services; ≥1Gbps for enterprise tenants; redundant international links.

Pricing

Land rental

•The land adjacent to Highway No 10 : 60US$/ m2 •The land adjacent to Main Road (32m wide) : 55US$/m2 •The land adjacent to Distributor Road (22.5m wide):50US$/ m2 The above price excludes the Land Use Tax

Land payment terms

Payment Form • Stage 1: Signing Land Sublease Agreement; deposit 40% of total land rent. • Stage 2: Signing Land Sublease Contract; pay the next installment of 40% of total land rent. • Stage 3: Handing over the land plot; pay the last installment of 20% of total land rent and 10% VAT.

Factory / Workshop

1. Office rental rate: 6USD/ m2/ month 2.Factory rental rate: 3,5 US$/m2/month (Basing on the location, area of the factory and the time for hire) (Included VAT)

Power tariff

1. Power Price (depending on each Voltage degree) • For the Voltage degree of from 22KV to 110KV:  Normal time (04:00 – 18:00) : 1,068 VND/Kwh  Off-peak time (22:00 – 04:00) : 670 VND/Kwh • For the under 6KV Voltage degree  Normal time (04:00 – 18:00) : 1,023VND/Kwh  Off-peak time (22:00 – 04:00) : 589 VND/Kwh

Service charges

Infrastructure maintenance: 0.41 USD/m2/year • Quarterly payment 0.1025 USD/m2/Quarter Including: - Maintenance and cleaning of foot-passes, roads - Maintenance and cleaning of sewers, pipelines, electric wire... - Lighting systems for the intern Road - Taking care of the green areas - Security for public areas • This charge is collected after the Investor receives Construction License Note: Above mentioned charges excludes VAT Above mentioned charges can be modified according to regulations of service providers.

Policies & Services

Policies

CIT incentive: 10% for 15 years, 4-year exemption + 50% reduction for the next 9 years (Law on Investment 2020). 11-year land rent exemption; import duty exemption on fixed-asset machinery. IPs inside Dinh Vu – Cat Hai EZ receive additional special incentives.

Project Location & Nearby

Searching within 5 km radius
Loading data…

Logistics Distance

Distance mode By road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1 Hai Phong Port Nearest 10.5 km
2 Cai Lan Port 50.6 km
3 Nghi Son Port 184.2 km
4 Vung Ang Port 310.4 km
5 Chan May Port 525.5 km
1 Nam Dinh River Port Nearest 65.9 km
2 Hanoi River Port 74.0 km
3 Ninh Binh River Port 92.1 km
4 Viet Tri River Port 131.1 km
5 Binh Duong River Port 1,098.4 km
1 Cat Bi Int. Airport Nearest 16.1 km
2 Noi Bai Int. Airport 89.1 km
3 Tho Xuan Airport (THD) 157.6 km
4 Vinh Airport (VII) 254.9 km
5 Dong Hoi Airport (VDH) 372.5 km
1 Hanoi - Hai Phong Expressway (CT03) Nearest 39.8 km
2 Ha Long - Hai Phong Expressway (CT10) 47.2 km
3 Hanoi - Bac Giang Expressway (CT05) 65.8 km
4 Hanoi - Thai Nguyen Expressway (CT02) 75.2 km
5 Ha Long - Van Don Expressway (CT11) 77.8 km
1 Hai Phong Railway Station Nearest 11.6 km
2 Hanoi Railway Station 78.4 km
3 Vinh Railway Station 261.4 km
4 Dong Hoi Railway Station 375.9 km
5 Hue Railway Station 500.4 km
1 Hai Phong City Nearest 11.8 km
2 Hai Duong City 28.4 km
3 Ha Long City 53.5 km
4 Hung Yen City 59.9 km
5 Bac Ninh City 63.0 km
Straight-line distance is an estimate. Road distance is calculated from the available routing service.

Investment Decision Tools

Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.

CIT Tax Incentive

Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt 2 years
50% reduction 4 years
Total incentive 10 years
NĐ 218/2013/NĐ-CP

Minimum Wage Region Region 4

3.450.000 ₫/month
Hourly wage 16.600 ₫
Effective from 2024-07-01

Workforce & Education

Province population 4,664K people

Setup Cost Estimator Interactive

Reference data — based on IP land, power, water prices and regional minimum wage 4.

Login Log in to save calculation scenarios.

Data sources & verification

Data Source Last verified Status
Overview & legal Not provided Not verified Unverified
Prices & fees Not provided Not verified Unverified
Available land & occupancy Not provided Not verified Unverified
Infrastructure Not provided Not verified Unverified
Logistics Not provided Not verified Unverified

Industrial Park Transparency

Occupancy, price movements, and infrastructure status updated over time.

Recorded data

Price movement

Land rent
USD/m²/year · 01/01/2026
96.00
USD
Factory rent
USD/m²/year · 01/01/2026
5.00
USD
Water price
VND/m³ · 01/01/2026
10,000.00
VND
Power price
VND/kWh · 01/01/2026
2,350.00
VND
Prices may vary by area, location, and lease term.

Price history chart

Quarterly rental price trends from aggregated market sources.

Loading data...

* Prices are indicative. Contact the industrial park management board for official quotations.

Ratings & Reviews (0)

Share practical feedback about infrastructure, service, pricing, and site experience.

0.0
0 reviews
5
0
4
0
3
0
2
0
1
0

Write a review

Guest reviews are moderated before publishing.

FAQ

Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.

VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.