VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.
Transport infrastructures
1. Road traffic:
- National Road 1A: runs through the province 98km.
- National Road 24A: Connecting National Road 1A (through Thach Tru, Mo Duc district, Quang Ngai province) with KonTum 69km and National Road 24B 18km.
- Provincial Road: Includes 18 routes with a total length of 520.5 km.
2. Railway:
Northern – Southern railway line: running the length of the province.
3. Air:
Chu Lai Airport (Quang Nam Province) 35 km from Quang Ngai City, Dung Quat Economic Zone 4km to the North.
4. Waterway:
Dung Quat deep-water seaport: with airtight advantage, how international maritime routes 90km, 30km inland sea routes and a depth of 10-19m, Dung Quat port was designed with multi-functional port system consists of:
+ Oil and Gas Terminal with cargo throughput of 6.1 million tons / year and the construction of 01 buoys to import crude oil for ships with a tonnage of 80,000 tons to 110,000 tons in the Gulf of Viet Thanh; port professional association with the United Shipbuilding industrial Park, Factory steel construction and heavy industry factory.
+ Combined Port is divided into two subdivisions: Integrated 1 port is behind Petroleum Terminal, ensures that ships with a tonnage of 5,000 tons - 50,000 tons; Integrated 2 port in the South of Dung Quat Bay, by the left Dap river.
+ Specialized Port in association with United Shipbuilding Industrial Park, Factory Steel construction and heavy industry factory.
+ Trading Port for bonded zone and 01 international container transshipment port located in the middle of Specialized and Integrated Port to catch ships from 10 to 15 thousand DWT.
+ Dung Quat port is invested and constructed to ensure the cargo volume by about 20 million tons / year in 2010 and about 34 million tons / year in 2020, currently it operates a general wharf for ships 1.5 thousand DWT.
