VIIPIP Vietnam Industrial Parks
English
English Vietnamese

AN HA

Ho Chi Minh City Industrial Park (Data) Nhut Thanh production - trade - construction - investment - consultancy JSC udating (08) 37 684 017 [email protected]
Total area
159.05 ha
Land available
42.2 ha
Factory available
81.31 m²
Land price
65 USD/m²
Occupancy rate73%
117 / 159 ha leased · 42 ha available
Land rate lower than province avg 22% (Prov. avg: 83.7)
🗺️ Province investment snapshot: Ho Chi Minh City
View full profile →
14,003K
Population
9.2M
Income/mo
66.2
PCI
$58.4B
FDI stock
312
Wards
6,773
km²
5km
To port

Overview

Address

Pham Van Hai Commune, Binh Chanh Commune, Binh Chanh District, HCMC

About / Location

+ North: to be fronted to Hoc Mon District, HCMC.

+ South: Facing to Provincial Road 10 ( far from IZ about 1.7 km).

+ East: to be fronted to An Ha curent residental area, Binh Chanh Dist, HCMC, connect to Provincal Road 10 and 9, Hoc Mon District. + West: bordering with Long An Province.

Infrastructure

Geology

- Constructing density: ≤ 60% - Average ceiling: 1-3 stories - Using land coefficient: ≤ 1.0

Traffic

Estimated capacity : 30 tons - Main road ( Noth- East) : 40 m in width - Main road ( North - West): 75 m in width

Power supply

- Voltage level: 22-15/ 0.4 kV( ±10%) - Frequency : 50( ±0.5)hz. - Capacity : 80MVA

Water supply

- Supplier: Water Supply Cho Lon JSC - Factory capacity : 300,000 m3/day. - Besides, using a standby underground water from Vinh Loc A and Binh loi Commune lead to the land.

Wastewater treatment

- Obtaining National Technical Regulation QCVN24 : 2009/BTNMT – column A - Capacity : 5,000 m3/day.night

Communication

With good quality for both domestic and international communication. 

Internet

To be connected to VNPT network, HCMC

Policies & Services

Services

An Ha IP supports procedure of business register certificate, investment certificate, land right certificate Warehouse available, bank, commercial area, school, hospital… Supply catering industry, resident area for worker.

Project Location & Nearby

Searching within 5 km radius
Loading data…

Logistics Distance

Distance mode By road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1 Saigon Port Nearest 22.1 km
2 Cat Lai Port 30.8 km
3 Phu My Port 62.8 km
4 Cai Mep Port 65.3 km
5 Vung Tau Port 81.5 km
1 Binh Duong River Port Nearest 26.4 km
2 Long Binh Tan River Port 44.5 km
3 My Tho River Port 52.5 km
4 Dong Nai River Port 55.7 km
5 Vinh Long River Port 85.4 km
1 Tan Son Nhat Int. Airport Nearest 16.4 km
2 Long Thanh Airport (future) 57.4 km
3 Can Tho Int. Airport (VCA) 118.8 km
4 Rach Gia Airport (VKG) 178.0 km
5 Lien Khuong Airport (DLI) 227.9 km
1 Ben Luc - Long Thanh Expressway (CT16) Nearest 27.0 km
2 HCM - Trung Luong Expressway (CT15) 27.5 km
3 HCM - Long An - Tien Giang Expressway 44.6 km
4 HCM - Chon Thanh Expressway (CT17) 51.1 km
5 HCM - Moc Bai Expressway (CT18) 54.9 km
1 Saigon Railway Station Nearest 18.7 km
2 Bien Hoa Railway Station 38.0 km
3 Nha Trang Railway Station 333.0 km
4 Da Nang Railway Station 613.0 km
5 Hue Railway Station 639.7 km
1 HCMC Center Nearest 21.3 km
2 Thu Dau Mot City 24.4 km
3 Tan An City 32.7 km
4 Bien Hoa City 39.9 km
5 My Tho City 53.4 km
Straight-line distance is an estimate. Road distance is calculated from the available routing service.

Investment Decision Tools

Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.

CIT Tax Incentive

Tax rate
17%
Ưu đãi tại Bình Dương – VSIP
100% exempt 2 years
50% reduction 4 years
Total incentive 10 years
NĐ 218/2013/NĐ-CP

Minimum Wage Region Region 4

3.450.000 ₫/month
Hourly wage 16.600 ₫
Effective from 2024-07-01

Workforce & Education

Province population 14,003K people

Setup Cost Estimator Interactive

Reference data — based on IP land, power, water prices and regional minimum wage 4.

Login Log in to save calculation scenarios.

Data sources & verification

Data Source Last verified Status
Overview & legal Not provided Not verified Unverified
Prices & fees Not provided Not verified Unverified
Available land & occupancy Not provided Not verified Unverified
Infrastructure Not provided Not verified Unverified
Logistics Not provided Not verified Unverified

Industrial Park Transparency

Occupancy, price movements, and infrastructure status updated over time.

Recorded data

Price history chart

Quarterly rental price trends from aggregated market sources.

Loading data...

* Prices are indicative. Contact the industrial park management board for official quotations.

Ratings & Reviews (0)

Share practical feedback about infrastructure, service, pricing, and site experience.

0.0
0 reviews
5
0
4
0
3
0
2
0
1
0

Write a review

Guest reviews are moderated before publishing.

FAQ

Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.

VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.