VIIPIP Vietnam Industrial Parks
English
English Vietnamese

Duc Hoa III - RESCO

Tay Ninh Province Industrial Park (Data) DUC HOA III – RESCO INDUSTRIAL & TOWN PARK JOINT STOCK COMPANY www.daresco.vn (84-72) 3759 745 [email protected] / [email protected]

Duc Hoa III - RESCO — 362.66ha, former Long An; IP in Tay Ninh Province.

Total area
362.66 ha
Land available
295.66 ha
Factory available
10 m²
Land price
55 USD/m²
Occupancy rate18%
67 / 363 ha leased · 296 ha available
Land rate lower than province avg 3% (Prov. avg: 56.9)
🗺️ Province investment snapshot: Tay Ninh Province
View full profile →
3,254K
Population
8,537
km²

Overview

Address

My Hanh Bac Commune, Duc Hoa Dist, Long An Province, Vietnam

About / Location

IP located in former Long An area, Tay Ninh Province (after Long An merger).

Infrastructure

Geology

The land will be provided at altitude of 1.85m and the designed altitude for construction is 2.2m.The flooding altitude in Long An is 1.45m with probability ratio of 1%. So, the land is currently 0.45m above the 100 year flooding level after filling-up the land.
Soil Bearing Pressure: <0,7 kg/cm2

Traffic

- Inter-road network including 2 main roads:

   + Road N4: 36 m (alongside South border of Industrial Park)

   + Road D1: 32m (alongside the West border of Industrial Park)

   + Road-lane: 4

- Xuyen A Road (Highway 22)

– North of Industrial Park.

- Border road 4 (DT823 – 824 – 825) towards to Tan An City and Ben Luc District.

- Border road 3- East of Industrial Park.

- Sea way located at Industrial Park: Thay Cai channel of 40m width capable of transporting small boats

Power supply

Electricity Company and currently promoting 110Kv power line for DUC HOA III - RESCO IP.
▪ 1 current local grid of 22 kV, capacity 40+63MVA, by Long An Electricity Company (EVN’s affiliate)
▪ 1 national grid of 110 kV, by Trang Bang – Duc Hoa power line which will be operated end of 2012. In 2013, DARESCO is going to build a transformer 110/22kV, capacity 1x25+1x40MVA

Water supply

o From Phu My Vinh Long An Water Supply JSC, capacity 15.000m3/day & night

o From Kenh Dong Long An Water Treatment Plant, capacity of first period is 40.000m3/day & night.
The sustainable pressure for water is 2.5 – 3kg/cm2.
Restriction on water consumption: The water can be consumed in the whole year. There is no restriction on water consumption

Wastewater treatment

Design capacity: 10.000 m3/day
The requirement to have a waste water treatment on site is depended on the quality of wastewater. The customer’s discharged waste water is required to meet level B of Vietnam waste water treatment standards and then level B waste water will be discharged to DUC HOA III - RESCO IP waste water treatment plant to treat to level A waste water before discharging to the environment.
▪ If, the customer’s discharged waste water already meets level B of Vietnam waste water treatment standards; so, there is not required to have a waste water treatment plant on site.
▪ If, the customer’s discharged waste water dose not meet level B of Vietnam waste water treatment standards; so, there is required to have a waste water treatment plant on site.

Communication

• Communication system in Duc Hoa III – RESCO Industrial Park is allowed to connect to Long An Telecommunication network.
• Its local system will be a telephone cable network with estimated subscription of 2,223, meeting sufficient requirements on telecommunication service in the industrial park.

Internet

FTTH fibre coverage; VNPT/Viettel/FPT/CMC services; ≥1Gbps for enterprise tenants.

Pricing

Land rental

USD$ 45/m2 ( 2058)

Land payment terms

Making payments in 1 year - 10% when signing land deposit agreement - 10% when receiving the investment certificate - 20% when singing the agreement for land sublease - 20% 3 months after signing the land sublease agreement - 20% 6 months after signing the land sublease agreement - 20% 12 months after signing the land sublease agreement Making delayed payments in 3 years - 10% when signing land deposit agreement - 10% when receiving the investment certificate - 20% when singing the agreement for land sublease - 10% 3 months after signing the land sublease agreement - 10% 6 months after signing the land sublease agreement - 10% 12 months after signing the land sublease agreement - 15% 2 years after signing the land sublease agreement * - 15% 3 years after signing the land sublease agreement* (*) Interest for delayed payment of 8%/year (in USD) under amortization method Besides that, DARESCO also gives annual payment which is flexible and suitable with requirements of employers (all information, do not hesitate to contact to Marketing Division ) (all above prices are excluded from VAT).

Factory / Workshop

+ N/A

Power tariff

Under the regulation of EVN

Water tariff

Under the regulation of Long An Province

Wastewater fee

+ N/A

Service charges

+ Periodly

Other fees

Infrastructure maintenance fee US$ 0.5/m2/year

Policies & Services

Investment process

Policies

Free of 02 years, 50% in the next 04 years. 17% corporate income tax.

Welcome:

- Mechanical industry: manufacturing accessories for industrial, products serving for transport services
- Electronic industry – information technology: manufacturing informatics devices, civil Electronic products, Electronic installation, etc
- Consumption industry: providing garment industry, plastic industry, advanced glass and ceramic industry, agricultural and forestry processing industry
- Other light industries: manufacturing devices serving for education, sport, advanced material, package

Services

- Register a business + tax  munber

- set up a branch register

- Register of investment certificates

- Procedures for land use right certificates (split plot)

Layout history (1)

Phân lô
Phân lô
02/07/2008

Project Location & Nearby

Searching within 5 km radius
Loading data…

Logistics Distance

Distance mode By road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1 Saigon Port Nearest 33.9 km
2 Cat Lai Port 41.4 km
3 Phu My Port 75.1 km
4 Cai Mep Port 78.0 km
5 Vung Tau Port 95.6 km
1 Binh Duong River Port Nearest 25.0 km
2 Long Binh Tan River Port 48.8 km
3 Dong Nai River Port 60.4 km
4 My Tho River Port 64.6 km
5 Vinh Long River Port 92.1 km
1 Tan Son Nhat Int. Airport Nearest 26.4 km
2 Long Thanh Airport (future) 65.6 km
3 Can Tho Int. Airport (VCA) 124.3 km
4 Rach Gia Airport (VKG) 180.5 km
5 Lien Khuong Airport (DLI) 227.9 km
1 HCM - Trung Luong Expressway (CT15) Nearest 36.8 km
2 Ben Luc - Long Thanh Expressway (CT16) 38.3 km
3 HCM - Chon Thanh Expressway (CT17) 41.2 km
4 HCM - Moc Bai Expressway (CT18) 42.2 km
5 HCM - Long An - Tien Giang Expressway 50.9 km
1 Saigon Railway Station Nearest 30.3 km
2 Bien Hoa Railway Station 41.2 km
3 Nha Trang Railway Station 332.4 km
4 Da Nang Railway Station 601.8 km
5 Hue Railway Station 627.3 km
1 Thu Dau Mot City Nearest 22.7 km
2 HCMC Center 32.8 km
3 Bien Hoa City 43.1 km
4 Tan An City 45.1 km
5 My Tho City 65.4 km
Straight-line distance is an estimate. Road distance is calculated from the available routing service.

Investment Decision Tools

Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.

CIT Tax Incentive

Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt 2 years
50% reduction 4 years
Total incentive 10 years
NĐ 218/2013/NĐ-CP

Minimum Wage Region Region 4

3.450.000 ₫/month
Hourly wage 16.600 ₫
Effective from 2024-07-01

Workforce & Education

Province population 3,254K people

Setup Cost Estimator Interactive

Reference data — based on IP land, power, water prices and regional minimum wage 4.

Login Log in to save calculation scenarios.

Data sources & verification

Data Source Last verified Status
Overview & legal Not provided Not verified Unverified
Prices & fees Not provided Not verified Unverified
Available land & occupancy Not provided Not verified Unverified
Infrastructure Not provided Not verified Unverified
Logistics Not provided Not verified Unverified

Industrial Park Transparency

Occupancy, price movements, and infrastructure status updated over time.

Recorded data

Price history chart

Quarterly rental price trends from aggregated market sources.

Loading data...

* Prices are indicative. Contact the industrial park management board for official quotations.

Ratings & Reviews (0)

Share practical feedback about infrastructure, service, pricing, and site experience.

0.0
0 reviews
5
0
4
0
3
0
2
0
1
0

Write a review

Guest reviews are moderated before publishing.

FAQ

Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.

VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.