On QL1A; Ganh Hao port 28km; HCMC 280km; Ca Mau airport 70km.
Power supply
Power supply via 22kV national grid (EVN); backup substations ensuring ≥99% reliability.
Water supply
Clean water from regional waterworks, 3,000–10,000 m³/day, QCVN 01:2009/BYT compliant.
Wastewater treatment
Centralised wastewater treatment plant, 3,000–8,000 m³/day, QCVN 40:2011/BTNMT column A.
Internet
FTTH fibre coverage; VNPT/Viettel services; ≥500Mbps for enterprise tenants.
Policies & Services
Policies
CIT incentive: 10% for 15 years, 4-year exemption + 50% reduction for 9 more years (Law on Investment 2020). 11-year land rent exemption; import duty exemption on fixed-asset machinery. Ca Mau is on the special-difficulty investment incentive list — highest incentive tier.
Distance modeBy road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1
Can Tho Port
Nearest
82.9 km
Not loaded
2
Vung Tau Port
188.9 km
Not loaded
3
Saigon Port
195.4 km
Not loaded
4
Cai Mep Port
199.9 km
Not loaded
5
Cat Lai Port
200.7 km
Not loaded
1
Ca Mau River Port
Nearest
65.0 km
Not loaded
2
Vinh Long River Port
110.0 km
Not loaded
3
My Tho River Port
137.4 km
Not loaded
4
Binh Duong River Port
214.7 km
Not loaded
5
Long Binh Tan River Port
222.7 km
Not loaded
1
Can Tho Int. Airport (VCA)
Nearest
88.1 km
Not loaded
2
Rach Gia Airport (VKG)
98.9 km
Not loaded
3
Con Dao Airport (VCS)
117.0 km
Not loaded
4
Tan Son Nhat Int. Airport
197.7 km
Not loaded
5
Phu Quoc Int. Airport (PQC)
219.5 km
Not loaded
1
Can Tho - Ca Mau Expressway (CT23)
Nearest
47.5 km
Not loaded
2
Chau Doc - Can Tho - Soc Trang Expressway
82.6 km
Not loaded
3
My Thuan - Can Tho Expressway (CT22)
104.2 km
Not loaded
4
Trung Luong - My Thuan Expressway (CT21)
123.6 km
Not loaded
5
HCM - Long An - Tien Giang Expressway
148.9 km
Not loaded
1
Saigon Railway Station
Nearest
195.3 km
Not loaded
2
Bien Hoa Railway Station
219.9 km
Not loaded
3
Nha Trang Railway Station
500.9 km
Not loaded
4
Da Nang Railway Station
800.1 km
Not loaded
5
Hue Railway Station
822.8 km
Not loaded
1
Bac Lieu City
Nearest
0.5 km
Not loaded
2
Soc Trang City
43.4 km
Not loaded
3
Ca Mau City
65.1 km
Not loaded
4
Can Tho Center
83.7 km
Not loaded
5
Rach Gia City
107.2 km
Not loaded
Straight-line distance is an estimate. Road distance is calculated from the available routing service.
Investment Decision Tools
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
CIT Tax Incentive
Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt2 years
50% reduction4 years
Total incentive10 years
NĐ 218/2013/NĐ-CP
Minimum Wage Region Region 4
3.450.000 ₫/month
Hourly wage16.600 ₫
Effective from2024-07-01
Workforce & Education
Province population2,607K people
Setup Cost Estimator Interactive
Reference data — based on IP land, power, water prices and regional minimum wage 4.
Occupancy, price movements, and infrastructure status updated over time.
Recorded data
Price history chart
Quarterly rental price trends from aggregated market sources.
Loading data...
No price history is available for this type.
* Prices are indicative. Contact the industrial park management board for official quotations.
Ratings & Reviews (0)
Share practical feedback about infrastructure, service, pricing, and site experience.
0.0
0 reviews
5
0
4
0
3
0
2
0
1
0
Write a review
FAQ
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.
Investors should review land availability, lease term, infrastructure readiness, utilities, workforce access, logistics distance, management support, and applicable investment incentives before making a site visit or reservation.
Straight-line distance is estimated from map coordinates. Road distance is calculated through the routing service when you switch the Logistics Distance mode to By road.
Yes. Use the Contact / Send inquiry form on this page and include your required land area, factory size, industry, timeline, and preferred contact method.
Typical documents include company profile, proposed project scope, investment capital, land or factory demand, environmental requirements, and expected implementation schedule.
Contact / Send inquiry
Send your requirements to the industrial park team. We will route the message with the selected purpose and project details.
Login
Select Location
Filter products by location
Product successfully added to your cart!
VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.