Song Doc town, Tran Van Thoi district, Ca Mau Province.
Infrastructure
Traffic
On-site Song Doc fishing port; Ca Mau City 50km; Ca Mau airport 55km.
Power supply
Power supply via 22kV national grid (EVN); backup substations ensuring ≥99% reliability.
Water supply
Clean water from regional waterworks, 3,000–10,000 m³/day, QCVN 01:2009/BYT compliant.
Wastewater treatment
Centralised wastewater treatment plant, 3,000–8,000 m³/day, QCVN 40:2011/BTNMT column A.
Internet
FTTH fibre coverage; VNPT/Viettel services; ≥500Mbps for enterprise tenants.
Policies & Services
Policies
CIT incentive: 10% for 15 years, 4-year exemption + 50% reduction for 9 more years (Law on Investment 2020). 11-year land rent exemption; import duty exemption on fixed-asset machinery. Ca Mau is on the special-difficulty investment incentive list — highest incentive tier.
Distance modeBy road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1
Can Tho Port
Nearest
151.1 km
Not loaded
2
Saigon Port
279.9 km
Not loaded
3
Vung Tau Port
285.3 km
Not loaded
4
Cat Lai Port
286.8 km
Not loaded
5
Cai Mep Port
293.3 km
Not loaded
1
Ca Mau River Port
Nearest
37.2 km
Not loaded
2
Vinh Long River Port
182.9 km
Not loaded
3
My Tho River Port
221.8 km
Not loaded
4
Binh Duong River Port
294.7 km
Not loaded
5
Long Binh Tan River Port
308.0 km
Not loaded
1
Rach Gia Airport (VKG)
Nearest
106.5 km
Not loaded
2
Can Tho Int. Airport (VCA)
150.0 km
Not loaded
3
Phu Quoc Int. Airport (PQC)
162.7 km
Not loaded
4
Con Dao Airport (VCS)
199.9 km
Not loaded
5
Tan Son Nhat Int. Airport
280.3 km
Not loaded
1
Can Tho - Ca Mau Expressway (CT23)
Nearest
110.7 km
Not loaded
2
Chau Doc - Can Tho - Soc Trang Expressway
128.5 km
Not loaded
3
My Thuan - Can Tho Expressway (CT22)
172.7 km
Not loaded
4
Trung Luong - My Thuan Expressway (CT21)
198.8 km
Not loaded
5
HCM - Long An - Tien Giang Expressway
224.1 km
Not loaded
1
Saigon Railway Station
Nearest
278.9 km
Not loaded
2
Bien Hoa Railway Station
303.7 km
Not loaded
3
Nha Trang Railway Station
594.1 km
Not loaded
4
Da Nang Railway Station
862.6 km
Not loaded
5
Hue Railway Station
877.6 km
Not loaded
1
Ca Mau City
Nearest
37.1 km
Not loaded
2
Bac Lieu City
101.3 km
Not loaded
3
Rach Gia City
110.8 km
Not loaded
4
Soc Trang City
139.0 km
Not loaded
5
Can Tho Center
149.2 km
Not loaded
Straight-line distance is an estimate. Road distance is calculated from the available routing service.
Investment Decision Tools
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
CIT Tax Incentive
Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt2 years
50% reduction4 years
Total incentive10 years
NĐ 218/2013/NĐ-CP
Minimum Wage Region Region 4
3.450.000 ₫/month
Hourly wage16.600 ₫
Effective from2024-07-01
Workforce & Education
Province population2,607K people
Setup Cost Estimator Interactive
Reference data — based on IP land, power, water prices and regional minimum wage 4.
Occupancy, price movements, and infrastructure status updated over time.
Recorded data
Price history chart
Quarterly rental price trends from aggregated market sources.
Loading data...
No price history is available for this type.
* Prices are indicative. Contact the industrial park management board for official quotations.
Ratings & Reviews (0)
Share practical feedback about infrastructure, service, pricing, and site experience.
0.0
0 reviews
5
0
4
0
3
0
2
0
1
0
Write a review
FAQ
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.
Investors should review land availability, lease term, infrastructure readiness, utilities, workforce access, logistics distance, management support, and applicable investment incentives before making a site visit or reservation.
Straight-line distance is estimated from map coordinates. Road distance is calculated through the routing service when you switch the Logistics Distance mode to By road.
Yes. Use the Contact / Send inquiry form on this page and include your required land area, factory size, industry, timeline, and preferred contact method.
Typical documents include company profile, proposed project scope, investment capital, land or factory demand, environmental requirements, and expected implementation schedule.
Contact / Send inquiry
Send your requirements to the industrial park team. We will route the message with the selected purpose and project details.
Login
Select Location
Filter products by location
Product successfully added to your cart!
VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.