VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.
700 ha expansion IP within Van Phong EZ, southern Ninh Hoa cluster.
Ninh Diem 2 Industrial Park spans 700 ha in Ninh Hoa Town (southern part of Van Phong EZ). The IP expands the existing Ninh Thuy/Ninh Diem industrial cluster, focusing on shipbuilding support, energy equipment, and heavy mechanics serving the BOT Van Phong thermal power plant.
2x110 kV substations + direct connection to Van Phong power plant.
Internal water: 12,000 m³/day.
WWTP: 8,000 m³/day, Class A.
EZ incentives applied. Energy-cluster integration advantages.
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
Reference data — based on IP land, power, water prices and regional minimum wage 4.
| Data | Source | Last verified | Status |
|---|---|---|---|
| Overview & legal | Not provided | Not verified | Unverified |
| Prices & fees | Not provided | Not verified | Unverified |
| Available land & occupancy | Not provided | Not verified | Unverified |
| Infrastructure | Not provided | Not verified | Unverified |
| Logistics | Not provided | Not verified | Unverified |
Occupancy, price movements, and infrastructure status updated over time.
Quarterly rental price trends from aggregated market sources.
* Prices are indicative. Contact the industrial park management board for official quotations.
Share practical feedback about infrastructure, service, pricing, and site experience.
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.