Within the key economic triangle of the northern region: Hanoi – Hai Phong – Quang Ninh.
- Road:
+ National highway No. 1A to Lang Son.
+ National highway No.18 to Cai Lan seaport – Quang Ninh.
+ National highway No.18 to Noi Bai International Airport.
- Railway:
+ Hanoi – Lang Son
+ Yen Vien – Cai Lan (Quang Ninh).
- 33 km to Hanoi capital
Seaport
Seaport - 110km away from Hai Phong port.
- 115 km away Cai Lan deep-water port in Quang Ninh.
Airport
35km away from Noi Bai International Airport.
Border gate
100 km away from Lang Son international border gate.
Infrastructure
Power supply
’- National grid - 40MVAx2 transformer station dropping to 22KV, supplies electricity to the electric ploles in IP.
Water supply
Water plant was built in Quang Chau Industrial Park, which using GE membrane technology of US, to sufficiently and steadily provide water to every enterprises in the Industrial Park with capacity of 5,000 m3/day.
Communication
Available
Internet
Available
Pricing
Land rental
- Along to 1A high way: US$ 55 /m2/45 years
- Main Roads of Industrial Park: US$ 50 /m2/45 years
- Roads in IP: US$ 45 /m2/45 years
Land payment terms
- Signing the Land Lease Agreement. Paying deposit
equivalent to 40% of total rental within 03 to 05 days
after signing the Land Lease Agreement.
- Within 30 days after signing the Land Sub-lease Agreement, The investors have to submit the Application for Investment Certificate and other concerned documents in accordance with Vietnam laws.
- If the Application for Investment is :
1. Approved: carry out for the next step.
2. Rejected: refund deposit without interest. Both parties shall be out of mutually benefits and obligations.
- The Lessee shall sign the Land-Sublease Contract within 05 days from the date of Investment approved by Relevant Authorities.
- The Lessee shall pay 40% of total rental within 05 days after signing the Land Sublease Contract.
- Within 05 days after handing over the land, the Lessee shall pay 20% of remaining rental (or delayed payment within 2 years and bear the interest rate of 12% per year based on the remaining rental by USD).
Power tariff
According to price table made by EVN:
(Current price for your ref)
Water tariff
Water plant was built in Quang Chau Industrial
Park, which using GE membrane technology
of US, to sufficiently and steadily provide water
to every enterprises in the Industrial Park with
capacity of 5,000 m3/day.
Service charges
- Fee for managing and maintaining infrastructure: 0.4 USD/m2/year
- Fees of telephone, fax, ect. shall be paid according to the utilities companies.
Distance modeBy road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1
Hai Phong Port
Nearest
70.8 km
Not loaded
2
Cai Lan Port
101.6 km
Not loaded
3
Nghi Son Port
205.1 km
Not loaded
4
Vung Ang Port
350.9 km
Not loaded
5
Chan May Port
578.1 km
Not loaded
1
Hanoi River Port
Nearest
36.7 km
Not loaded
2
Viet Tri River Port
73.6 km
Not loaded
3
Nam Dinh River Port
89.0 km
Not loaded
4
Ninh Binh River Port
107.0 km
Not loaded
5
Binh Duong River Port
1,138.9 km
Not loaded
1
Noi Bai Int. Airport
Nearest
31.1 km
Not loaded
2
Cat Bi Int. Airport
77.8 km
Not loaded
3
Tho Xuan Airport (THD)
160.5 km
Not loaded
4
Vinh Airport (VII)
279.3 km
Not loaded
5
Dong Hoi Airport (VDH)
414.6 km
Not loaded
1
Hanoi - Bac Giang Expressway (CT05)
Nearest
3.9 km
Not loaded
2
Hanoi - Thai Nguyen Expressway (CT02)
20.7 km
Not loaded
3
Hanoi - Hai Phong Expressway (CT03)
33.3 km
Not loaded
4
Hanoi - Hoa Binh Expressway (CT07)
56.4 km
Not loaded
5
Bac Giang - Lang Son Expressway (CT06)
62.7 km
Not loaded
1
Hanoi Railway Station
Nearest
34.8 km
Not loaded
2
Hai Phong Railway Station
72.1 km
Not loaded
3
Vinh Railway Station
286.2 km
Not loaded
4
Dong Hoi Railway Station
418.0 km
Not loaded
5
Hue Railway Station
550.4 km
Not loaded
1
Bac Ninh City
Nearest
4.6 km
Not loaded
2
Hanoi Center
33.5 km
Not loaded
3
Hai Duong City
37.7 km
Not loaded
4
Thai Nguyen City
49.9 km
Not loaded
5
Hung Yen City
63.5 km
Not loaded
Straight-line distance is an estimate. Road distance is calculated from the available routing service.
Investment Decision Tools
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
CIT Tax Incentive
Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt2 years
50% reduction4 years
Total incentive10 years
NĐ 218/2013/NĐ-CP
Minimum Wage Region Region 4
3.450.000 ₫/month
Hourly wage16.600 ₫
Effective from2024-07-01
Workforce & Education
Province population3,619K people
Setup Cost Estimator Interactive
Reference data — based on IP land, power, water prices and regional minimum wage 4.
Occupancy, price movements, and infrastructure status updated over time.
Recorded data
Price history chart
Quarterly rental price trends from aggregated market sources.
Loading data...
No price history is available for this type.
* Prices are indicative. Contact the industrial park management board for official quotations.
Ratings & Reviews (0)
Share practical feedback about infrastructure, service, pricing, and site experience.
0.0
0 reviews
5
0
4
0
3
0
2
0
1
0
Write a review
FAQ
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.
Investors should review land availability, lease term, infrastructure readiness, utilities, workforce access, logistics distance, management support, and applicable investment incentives before making a site visit or reservation.
Straight-line distance is estimated from map coordinates. Road distance is calculated through the routing service when you switch the Logistics Distance mode to By road.
Yes. Use the Contact / Send inquiry form on this page and include your required land area, factory size, industry, timeline, and preferred contact method.
Typical documents include company profile, proposed project scope, investment capital, land or factory demand, environmental requirements, and expected implementation schedule.
Contact / Send inquiry
Send your requirements to the industrial park team. We will route the message with the selected purpose and project details.
Login
Select Location
Filter products by location
Product successfully added to your cart!
VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.