VIIPIP Vietnam Industrial Parks
English
English Vietnamese

Soc Son Industrial Park 204 ha (Proposed)

Ha Noi Industrial Park (Data) Soc Son Industrial Park Management Board https://www.socson.hanoi.gov.vn (+84-24) 3851 2530 [email protected]

Proposed 204-ha industrial park spanning Mai Dinh, Quang Tien, and Tien Duoc communes in Soc Son District – adjacent to Noi Bai International Airport. Ideal for aviation-linked manufacturing, logistics, and cold-chain industries.

Total area
204 ha
Land available
204 ha
Land price
80 USD/m²
Occupancy rate0%
0 / 204 ha leased · 204 ha available
Land rate lower than province avg 9% (Prov. avg: 88.0)
🗺️ Province investment snapshot: Ha Noi
View full profile →
8,808K
Population
8.1M
Income/mo
67.1
PCI
$41.2B
FDI stock
579
Wards
3,360
km²
105km
To port

Overview

Address

Mai Dinh, Quang Tien, Tien Duoc Communes, Soc Son District, Hanoi

About / Location

Soc Son District, northeastern Hanoi, bordered by Thai Nguyen, Bac Giang and Vinh Phuc. Southern communes near Noi Bai Airport are relatively flat. At the junction of Noi Bai–Lao Cai Expressway, National Roads 3 and 2.

Infrastructure

Geology

Flat alluvial/suburban terrain. Foundation bearing capacity 1.5–2.0 kg/cm². Standard pile or strip foundations suitable.

Traffic

• Noi Bai International Airport – 3 km (direct) • Noi Bai–Lao Cai Expressway – 5 km • National Road 3 (Hanoi–Thai Nguyen) – 2 km • Ring Road 4 (under construction) – 8 km • Hanoi city centre – 30 km

Power supply

Connection to 220/110 kV Bac Thang Long substation network. Planned: 4×40 MVA.

Water supply

Connection to the Me Linh–Soc Son water supply grid. Capacity to be confirmed at planning stage.

Wastewater treatment

Planned centralised WTP: 5,000 m³/day to QCVN 40:2011 Class A.

Communication

IDD telephone and fibre network. Full 4G/5G mobile coverage.

Internet

High-speed fibre internet (VNPT, Viettel, FPT) throughout the park. Dedicated fibre up to 10 Gbps for enterprises.

Pricing

Land rental

Land lease price: approximately USD 80/m² for the full 50-year lease term (reference). Minimum plot 2,000 m².

Factory / Workshop

No ready-built workshops (land-only or planned).

Power tariff

EVN North 2025 industrial tariff (medium voltage): • Off-peak (22:00–06:00): 1,079 VND/kWh • Normal hours: 1,672 VND/kWh • Peak hours (09:30–11:30, 17:00–20:00): 2,985 VND/kWh

Water tariff

Industrial water supply: 15,000 VND/m³. Wastewater treatment: 9,000 VND/m³.

Wastewater fee

Planned centralised WTP: 5,000 m³/day to QCVN 40:2011 Class A.

Service charges

Infrastructure service fee: USD 0.35–0.45/m²/month (land area basis).

Policies & Services

Policies

• Priority: air-logistics, aviation support, cold chain, general manufacturing • 50-year land lease under standard KCN regime • Ring Road 4 completion (est. 2027) will greatly improve access • One-stop service via HIZA

Special incentives

• Priority: air-logistics, aviation support, cold chain, general manufacturing • 50-year land lease under standard KCN regime • Ring Road 4 completion (est. 2027) will greatly improve access • One-stop service via HIZA

Project Location & Nearby

Searching within 5 km radius
Loading data…

Logistics Distance

Distance mode By road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1 Hai Phong Port Nearest 96.1 km
2 Cai Lan Port 127.6 km
3 Nghi Son Port 209.2 km
4 Vung Ang Port 361.4 km
5 Chan May Port 594.0 km
1 Hanoi River Port Nearest 34.7 km
2 Viet Tri River Port 47.9 km
3 Nam Dinh River Port 100.8 km
4 Ninh Binh River Port 113.8 km
5 Binh Duong River Port 1,147.7 km
1 Noi Bai Int. Airport Nearest 8.9 km
2 Cat Bi Int. Airport 102.8 km
3 Tho Xuan Airport (THD) 158.7 km
4 Vinh Airport (VII) 283.4 km
5 Dong Hoi Airport (VDH) 425.5 km
1 Hanoi - Thai Nguyen Expressway (CT02) Nearest 15.5 km
2 Hanoi - Bac Giang Expressway (CT05) 22.3 km
3 Hanoi - Hoa Binh Expressway (CT07) 49.1 km
4 Hanoi - Hai Phong Expressway (CT03) 52.3 km
5 Tuyen Quang - Phu Tho Expressway (CT08) 68.2 km
1 Hanoi Railway Station Nearest 28.5 km
2 Hai Phong Railway Station 97.4 km
3 Vinh Railway Station 290.4 km
4 Dong Hoi Railway Station 428.9 km
5 Hue Railway Station 564.9 km
1 Bac Ninh City Nearest 24.3 km
2 Hanoi Center 28.0 km
3 Thai Nguyen City 35.0 km
4 Viet Tri City 48.2 km
5 Hai Duong City 60.2 km
Straight-line distance is an estimate. Road distance is calculated from the available routing service.

Investment Decision Tools

Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.

CIT Tax Incentive

Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt 2 years
50% reduction 4 years
Total incentive 10 years
NĐ 218/2013/NĐ-CP

Minimum Wage Region Region 4

3.450.000 ₫/month
Hourly wage 16.600 ₫
Effective from 2024-07-01

Workforce & Education

Province population 8,808K people

Setup Cost Estimator Interactive

Reference data — based on IP land, power, water prices and regional minimum wage 4.

Login Log in to save calculation scenarios.

Data sources & verification

Data Source Last verified Status
Overview & legal Not provided Not verified Unverified
Prices & fees Not provided Not verified Unverified
Available land & occupancy Not provided Not verified Unverified
Infrastructure Not provided Not verified Unverified
Logistics Not provided Not verified Unverified

Industrial Park Transparency

Occupancy, price movements, and infrastructure status updated over time.

Recorded data

Price history chart

Quarterly rental price trends from aggregated market sources.

Loading data...

* Prices are indicative. Contact the industrial park management board for official quotations.

Ratings & Reviews (0)

Share practical feedback about infrastructure, service, pricing, and site experience.

0.0
0 reviews
5
0
4
0
3
0
2
0
1
0

Write a review

Guest reviews are moderated before publishing.

FAQ

Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.

VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.