– Yen Phong Industrial Park is connected to national road No. 18 by a intersection traffic point and a flyover bridge. Traffic routes inside Industrial Parks are planned in square pattern, facilitating the entering into building areas.
– Main roads have two 80m lanes. Branch roads are 40m and 22m.
Power is supplied by national power network via 110/22kV (35KV) transformer station with current capacity of 7 x 63 MVA.
– Waste water treatment station runs with the 1st phase capacity 28,000 m3/day and second phase capacity of 12,000m3/day. (Industry waste water is calculated by 80% of water supply volume).
– The waste water drainage pipe is D300mm – D750mm
– Waste from factories in the IP shall be categorized immediately in all factory and be collected to the centered treatment area of Bac Ninh province.
A satellite switch board with 4,000 numbers, modern communication system reachs international standard and ready to meet full demands concerning on national and international communication services.