Thanh Thanh Cong Industrial Zone

Tay Ninh Province Industrial Park (Data) Cty Cổ phần Khu công nghiệp Thành Thành Công https://kkttayninh.vn/khu-cong-nghiep-thanh-thanh- +84 276 3812 196 [email protected]

Thanh Thanh Cong Industrial Zone — 1,020ha, Tay Ninh; IP in Tay Ninh Province.

Total area
1020 ha
Land available
760 ha
Factory available
10 m²
Land price
37 USD/m²
Occupancy rate25%
260 / 1,020 ha leased · 760 ha available
Land rate lower than province avg 35% (Prov. avg: 56.9)
🗺️ Province investment snapshot: Tay Ninh Province
View full profile →
3,254K
Population
8,537
km²

Overview

About / Location

Located in Anhoa commune, Trang Bang district, Tay Ninh province;

connected to HCMC via No.22 highway or Trans-Asia highway.

The location is convenient for transportation and communication as following:
- 54km to center of HCM City (through No.22 highway)
- 45km to Binh Duong province (through No.2 provincial road)
- 18km to Long An province (through 787 provincial road)
- 19km to Moc Bai border gate to Cambodia
- 60km to Cat Lai Container port
- 109km to SPCT international container port

Infrastructure

Geology

"Topographic and geological characteristic: Land is flat and even; leveling altitude +1.9m compared to the Hondau national benchmark; land bearing capacity 600kg/sqm; coefficent of compressibility k>=0.85"

Traffic

Internal asphalt-concrete road system is designed and built in

compliance with standards of H30 loading capacity.
Main roads: from 30m to 40m wide; from 2 lanes to 6 lanes

Power supply

First stage: supplied by the government power system through

Trang Bang power station (110kV/22kV)
Second stage: and internal power station with productivity of 200 MW will be developed

as a national project.
 Unit price: according to standard taiff of EVN 

Water supply

Total designed productivity: 37.000 m3/day&night
First stage: 3000 m
3/day&night (completed on October 2010)
Unit price: 4.500 VND/m
3

Wastewater treatment

Total designed productivity: 30.000 m3/day&night
First stage: 3000 m
3 /day&night (completed on October 2010)
Unit price: 4.500 VND/m
3

Communication

Standard system developed by VNPT or FPT

Internet

FTTH fibre coverage; VNPT/Viettel/FPT/CMC services; ≥1Gbps for enterprise tenants.

Pricing

Land rental

37-42usd/m2/2058

Land payment terms

Flexible payment period: 1 year; 3 years; 5 years

Factory / Workshop

1152sqm

Water tariff

4,500 VND/m3 (0.24 USD)

Policies & Services

Investment process

1. Bourbon Anhoa asks for advice and approvement of Taniza (Industrial park management department of Tay Ninh) to receive the investor.

2. Sign land reservation agreement after the investor choose a landlot

3. Apply for investment license (Bourbon will get the license for the investor within 3 to 7 days)

4. Sign land sub-lease contract

5. Land handover

6. Apply for factory building license (20 days)

7. Install the system of infrastructure (water, power, telecommunication...) 8. Start operation"

Policies

Bourbon Anhoa is developing an industrial park which is smoothly connected with the regional infrastructure. We not only provide utilities to assure productivity to the investors but also positively contribute to the sustainable development of the community. Therefore, we are concurrently developing three projects in the area: 760 ha of industrial land, 76 ha of residential area, and 186 ha of a river port. Moreover, invesstor in light industries and green industries are especially welcome in our industrial park.

Services

- Domitory for workers
- Water supply and waste water treatment system
- Collection and treatment of solid wastes
- Importing and exporting  services
- Training and employment
- River port to handle raw material

Layout history (1)

Bussiness Field
Bussiness Field
22/10/2010

Project Location & Nearby

Searching within 5 km radius
Loading data…

Logistics Distance

Distance mode By road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1 Saigon Port Nearest 51.8 km
2 Cat Lai Port 59.2 km
3 Phu My Port 92.9 km
4 Cai Mep Port 95.9 km
5 Vung Tau Port 113.2 km
1 Binh Duong River Port Nearest 39.4 km
2 Long Binh Tan River Port 64.5 km
3 My Tho River Port 73.9 km
4 Dong Nai River Port 75.9 km
5 Vinh Long River Port 93.5 km
1 Tan Son Nhat Int. Airport Nearest 44.3 km
2 Long Thanh Airport (future) 82.6 km
3 Can Tho Int. Airport (VCA) 123.4 km
4 Rach Gia Airport (VKG) 175.3 km
5 Lien Khuong Airport (DLI) 238.1 km
1 HCM - Moc Bai Expressway (CT18) Nearest 24.6 km
2 HCM - Chon Thanh Expressway (CT17) 44.5 km
3 HCM - Trung Luong Expressway (CT15) 45.2 km
4 HCM - Long An - Tien Giang Expressway 54.2 km
5 Ben Luc - Long Thanh Expressway (CT16) 56.2 km
1 Saigon Railway Station Nearest 48.2 km
2 Bien Hoa Railway Station 56.7 km
3 Nha Trang Railway Station 341.7 km
4 Da Nang Railway Station 597.3 km
5 Hue Railway Station 620.8 km
1 Thu Dau Mot City Nearest 37.4 km
2 HCMC Center 50.6 km
3 Tan An City 55.9 km
4 Bien Hoa City 58.4 km
5 My Tho City 74.8 km
Straight-line distance is an estimate. Road distance is calculated from the available routing service.

Investment Decision Tools

Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.

CIT Tax Incentive

Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt 2 years
50% reduction 4 years
Total incentive 10 years
NĐ 218/2013/NĐ-CP

Minimum Wage Region Region 4

3.450.000 ₫/month
Hourly wage 16.600 ₫
Effective from 2024-07-01

Workforce & Education

Province population 3,254K people

Setup Cost Estimator Interactive

Reference data — based on IP land, power, water prices and regional minimum wage 4.

Login Log in to save calculation scenarios.

Data sources & verification

Data Source Last verified Status
Overview & legal Not provided Not verified Unverified
Prices & fees Not provided Not verified Unverified
Available land & occupancy Not provided Not verified Unverified
Infrastructure Not provided Not verified Unverified
Logistics Not provided Not verified Unverified

Industrial Park Transparency

Occupancy, price movements, and infrastructure status updated over time.

Recorded data

Occupancy rate

72.6%
Filling quickly
740.5 ha
Leased
279.5 ha
Available
Recent trend
Updated: 01/05/2026

Price history chart

Quarterly rental price trends from aggregated market sources.

Loading data...

* Prices are indicative. Contact the industrial park management board for official quotations.

Ratings & Reviews (0)

Share practical feedback about infrastructure, service, pricing, and site experience.

0.0
0 reviews
5
0
4
0
3
0
2
0
1
0

Write a review

Guest reviews are moderated before publishing.

FAQ

Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.

VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.