VIIPIP Vietnam Industrial Parks
English
English Vietnamese

LOC AN BINH SON IP

Dong Nai Industrial Park (Data) V.R.G Long Thanh Development & Investment JSC https://locanbinhson.vn +84 251 3514 666 [email protected]

LOC AN BINH SON IP (Dong Nai), 497.77ha; multi-sector industrial park in Dong Nai Province.

Total area
497.77 ha
Land price
50 USD/m²
Occupancy rate100%
498 / 498 ha leased · 0 ha available
Land rate lower than province avg 14% (Prov. avg: 58.1)
🗺️ Province investment snapshot: Dong Nai
View full profile →
4,491K
Population
6.9M
Income/mo
64.9
PCI
$35.2B
FDI stock
170
Wards
12,737
km²
30km
To port

Overview

Address

Located at Long An, Loc An and Binh Son wards, Long Thanh district, Dong Nai province, location in corridor of National route 51

About / Location

Located at Long An, Loc An and Binh Son wards, Long Thanh district, Dong Nai province, location in corridor of National route 51. - The North near by ĐT 769 (internal road No.10) Long Thanh - Dau Giay Expressway and one part near by internal road No.25 to Dau Giay. - The South land in crop (separate distance HCMC - Long Thanh - Dau Giay Expressway). - The East near by Binh Son Urban - The West is Loc An residential quarter.

Infrastructure

Geology

- Topography at the fairy high area. - Land characteristic: hard structure and stone, advantages for construction factory

Traffic

Asphaltic concrete roads with loading capacity from 10 to 12 tons, including: - Main road: + type 1: width of road 39m + type 2: width of road 36m

Power supply

Electricity source is supplied by 220/110KV Long Thanh transformer station and National grid ensuring that supply 22 KV electricity source 24/24 hours to the fence of factories.

Water supply

Clean water is supplied by Nhon Trach - Thien Tan water plant with capacity is 100.000 m3/day ensuring that supply water 24/24 hours to the fence of factories.

Wastewater treatment

We have waste water treatment factory for all the factories in IZ with the capacity 9.200 m3/day, reach to standard TCVN 5945-2005 colum A.

Internet

Information system ensure communicating in country and International easily, including telephone, mobile phone, fax, internet,... time for supply this service from 7-10 days

Pricing

Land rental

* Land rental pay annually accordance with state * Using infrastructure cost: - Infrastructure fee: 0.5 USD/m2/ year; - Land using fee: 1,500 VND/m2/year (All cost above are not inclusive of VAT ). These above fees are applied for the customers who sign land leased contract before 01/01/2011.

Land payment terms

"Payment methods: - One time payment for whole duration; - Annual payment; - Installment payment in 5 years."

Wastewater fee

Expectation of waste water treatment price: 0,28 USD/m3

Project Location & Nearby

Searching within 5 km radius
Loading data…

Logistics Distance

Distance mode By road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1 Cat Lai Port Nearest 22.1 km
2 Phu My Port 24.1 km
3 Cai Mep Port 28.3 km
4 Saigon Port 31.0 km
5 Vung Tau Port 51.0 km
1 Dong Nai River Port Nearest 16.1 km
2 Long Binh Tan River Port 18.6 km
3 Binh Duong River Port 40.7 km
4 My Tho River Port 83.8 km
5 Vinh Long River Port 126.3 km
1 Long Thanh Airport (future) Nearest 5.2 km
2 Tan Son Nhat Int. Airport 36.1 km
3 Can Tho Int. Airport (VCA) 160.3 km
4 Lien Khuong Airport (DLI) 184.2 km
5 Rach Gia Airport (VKG) 223.2 km
1 Long Thanh - Dau Giay Expressway (CT25) Nearest 18.6 km
2 Bien Hoa - Vung Tau Expressway (CT19) 25.5 km
3 Ben Luc - Long Thanh Expressway (CT16) 26.3 km
4 HCM - Chon Thanh Expressway (CT17) 62.6 km
5 HCM - Trung Luong Expressway (CT15) 72.3 km
1 Bien Hoa Railway Station Nearest 24.8 km
2 Saigon Railway Station 34.0 km
3 Nha Trang Railway Station 289.5 km
4 Da Nang Railway Station 601.3 km
5 Hue Railway Station 634.2 km
1 Bien Hoa City Nearest 24.1 km
2 HCMC Center 31.4 km
3 Thu Dau Mot City 42.1 km
4 Vung Tau City 45.6 km
5 Tan An City 69.1 km
Straight-line distance is an estimate. Road distance is calculated from the available routing service.

Investment Decision Tools

Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.

CIT Tax Incentive

Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt 2 years
50% reduction 4 years
Total incentive 10 years
NĐ 218/2013/NĐ-CP

Minimum Wage Region Region 4

3.450.000 ₫/month
Hourly wage 16.600 ₫
Effective from 2024-07-01

Workforce & Education

Province population 4,491K people

Setup Cost Estimator Interactive

Reference data — based on IP land, power, water prices and regional minimum wage 4.

Login Log in to save calculation scenarios.

Data sources & verification

Data Source Last verified Status
Overview & legal Not provided Not verified Unverified
Prices & fees Not provided Not verified Unverified
Available land & occupancy Not provided Not verified Unverified
Infrastructure Not provided Not verified Unverified
Logistics Not provided Not verified Unverified

Industrial Park Transparency

Occupancy, price movements, and infrastructure status updated over time.

Recorded data

Price history chart

Quarterly rental price trends from aggregated market sources.

Loading data...

* Prices are indicative. Contact the industrial park management board for official quotations.

Ratings & Reviews (0)

Share practical feedback about infrastructure, service, pricing, and site experience.

0.0
0 reviews
5
0
4
0
3
0
2
0
1
0

Write a review

Guest reviews are moderated before publishing.

FAQ

Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.

VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.