VIIPIP Vietnam Industrial Parks
English
English Vietnamese

Long Thanh

Dong Nai Industrial Park (Data) Long Thanh SONADEZI Joint - Stock Company www.sonadezi.com.vn 0643977074 hoặc 061/ 3514494 / 3514497 [email protected]

Long Thanh (Dong Nai), 488ha; multi-sector industrial park in Dong Nai Province.

Total area
488 ha
Land available
303.35 ha
Factory available
4.1 m²
Land price
4 USD/m²
Occupancy rate38%
185 / 488 ha leased · 303 ha available
Land rate lower than province avg 93% (Prov. avg: 58.1)
🗺️ Province investment snapshot: Dong Nai
View full profile →
4,491K
Population
6.9M
Income/mo
64.9
PCI
$35.2B
FDI stock
170
Wards
12,737
km²
30km
To port

Overview

Address

Tam An Commune, Long Thanh Dist., Dong Nai Province

About / Location

(1) Cities :

-          Ho Chi Minh city : 45 km (will be 23 km from 2014)

-          Bien Hoa city : 15 km

-          Vung Tau city : 50 km

(2) Highways / Expressway :

-          Adjacent to highway No. 51

-          3 km to Highway HCM City - Long Thanh - Dau Giay (which goes in to operation by the end of 2013)

(3) Ports:

-          35 km to Phu My Deep Water Port

-          75 km to Vung Tau Sea Port

-          45 km to Cai Mep, Thi Vai

-          45 km to Saigon New port, Cat Lai

(4) Railways:

-          15 km to Bien Hoa Railway Station

-          30 km to Song Than Railway Station

(5) Airports:

-          45 km to Tan Son Nhat Airport (will be 23 km from 2014)

11 km to Long Thanh Int’l Airport (of which the first phase will go into operation by the end of 2020)

Infrastructure

Geology

+ Hard soil

Traffic

+ Width: 31m

+ Number of lanes: 4 lanes

Power supply

+ Power line: 110V/22KV

 + Capacity: 2 x 63 MVA

Water supply

 + Maximum Capacity:  20,000 m3/day

Wastewater treatment

+ Max capacity: 15.000 m3/day

Communication

+ IDD 3750 lines

Internet

+ ADSL 2 Mbps

Pricing

Land rental

+ 5USD/m2/year + 70 USD/m2/44 years (until 2053)

Land payment terms

One-time payment (10 days after signing land leasing contract) - Selling price (do not including VAT): 70USD/m2, area: 16.893m2

Factory / Workshop

Not inclusive of VAT

Power tariff

Above prices exclude VAT

Water tariff

Above prices exclude VAT

Wastewater fee

+ The above price is not including VAT + Sewage Treatment Fee is adjusted to adapt processing of waste concentration.

Service charges

Yearly

Other fees

+ N/A

Layout history (2)

15/05/2013
15/05/2013

Project Location & Nearby

Searching within 5 km radius
Loading data…

Logistics Distance

Distance mode By road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1 Cat Lai Port Nearest 35.3 km
2 Phu My Port 39.7 km
3 Saigon Port 43.2 km
4 Cai Mep Port 43.7 km
5 Vung Tau Port 65.9 km
1 Dong Nai River Port Nearest 6.4 km
2 Long Binh Tan River Port 17.9 km
3 Binh Duong River Port 42.8 km
4 My Tho River Port 99.8 km
5 Vinh Long River Port 141.3 km
1 Long Thanh Airport (future) Nearest 15.0 km
2 Tan Son Nhat Int. Airport 45.9 km
3 Lien Khuong Airport (DLI) 168.6 km
4 Can Tho Int. Airport (VCA) 175.3 km
5 Buon Ma Thuot Airport (BMV) 224.3 km
1 Long Thanh - Dau Giay Expressway (CT25) Nearest 1.7 km
2 Bien Hoa - Vung Tau Expressway (CT19) 30.6 km
3 Ben Luc - Long Thanh Expressway (CT16) 39.3 km
4 HCM - Chon Thanh Expressway (CT17) 56.6 km
5 CT01 Expressway: Phan Thiet - Dau Giay 70.9 km
1 Bien Hoa Railway Station Nearest 25.6 km
2 Saigon Railway Station 45.3 km
3 Nha Trang Railway Station 274.0 km
4 Da Nang Railway Station 584.0 km
5 Hue Railway Station 617.6 km
1 Bien Hoa City Nearest 23.9 km
2 HCMC Center 43.2 km
3 Thu Dau Mot City 44.9 km
4 Vung Tau City 59.2 km
5 Tan An City 83.8 km
Straight-line distance is an estimate. Road distance is calculated from the available routing service.

Investment Decision Tools

Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.

CIT Tax Incentive

Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt 2 years
50% reduction 4 years
Total incentive 10 years
NĐ 218/2013/NĐ-CP

Minimum Wage Region Region 4

3.450.000 ₫/month
Hourly wage 16.600 ₫
Effective from 2024-07-01

Workforce & Education

Province population 4,491K people

Setup Cost Estimator Interactive

Reference data — based on IP land, power, water prices and regional minimum wage 4.

Login Log in to save calculation scenarios.

Data sources & verification

Data Source Last verified Status
Overview & legal Not provided Not verified Unverified
Prices & fees Not provided Not verified Unverified
Available land & occupancy Not provided Not verified Unverified
Infrastructure Not provided Not verified Unverified
Logistics Not provided Not verified Unverified

Industrial Park Transparency

Occupancy, price movements, and infrastructure status updated over time.

Recorded data

Price history chart

Quarterly rental price trends from aggregated market sources.

Loading data...

* Prices are indicative. Contact the industrial park management board for official quotations.

Ratings & Reviews (0)

Share practical feedback about infrastructure, service, pricing, and site experience.

0.0
0 reviews
5
0
4
0
3
0
2
0
1
0

Write a review

Guest reviews are moderated before publishing.

FAQ

Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.

VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.