Dinh Vu peninsula, Hai An district, Hai Phong City (Dinh Vu - Cat Hai EZ)
About / Location
Dinh Vu peninsula, Hai An district, Hai Phong City (Dinh Vu – Cat Hai EZ).
Infrastructure
Traffic
On Tan Vu – Lach Huyen road; Hai Phong port 6km; Cat Bi airport 5km.
Power supply
Power supply via 22/35kV national grid (EVN Hai Phong); multiple backup substations ensuring 99.9% reliability.
Water supply
Clean water from regional waterworks (An Duong / Cau Nguyet), capacity 5,000–20,000 m³/day, QCVN 01:2009/BYT compliant.
Wastewater treatment
Centralised wastewater treatment plant, capacity 5,000–15,000 m³/day, treated to QCVN 40:2011/BTNMT column A.
Internet
Full FTTH fibre-optic coverage; VNPT/Viettel/FPT/CMC services; ≥1Gbps for enterprise tenants; redundant international links.
Policies & Services
Policies
CIT incentive: 10% for 15 years, 4-year exemption + 50% reduction for the next 9 years (Law on Investment 2020). 11-year land rent exemption; import duty exemption on fixed-asset machinery. IPs inside Dinh Vu – Cat Hai EZ receive additional special incentives.
Distance modeBy road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1
Hai Phong Port
Nearest
13.0 km
Not loaded
2
Cai Lan Port
33.3 km
Not loaded
3
Nghi Son Port
189.7 km
Not loaded
4
Vung Ang Port
305.4 km
Not loaded
5
Chan May Port
513.1 km
Not loaded
1
Nam Dinh River Port
Nearest
77.8 km
Not loaded
2
Hanoi River Port
96.5 km
Not loaded
3
Ninh Binh River Port
104.1 km
Not loaded
4
Viet Tri River Port
153.7 km
Not loaded
5
Binh Duong River Port
1,091.7 km
Not loaded
1
Cat Bi Int. Airport
Nearest
6.5 km
Not loaded
2
Noi Bai Int. Airport
111.5 km
Not loaded
3
Tho Xuan Airport (THD)
170.1 km
Not loaded
4
Vinh Airport (VII)
257.8 km
Not loaded
5
Dong Hoi Airport (VDH)
366.4 km
Not loaded
1
Ha Long - Hai Phong Expressway (CT10)
Nearest
29.9 km
Not loaded
2
Ha Long - Van Don Expressway (CT11)
60.0 km
Not loaded
3
Hanoi - Hai Phong Expressway (CT03)
62.3 km
Not loaded
4
Hanoi - Bac Giang Expressway (CT05)
87.4 km
Not loaded
5
Bac Giang - Lang Son Expressway (CT06)
91.7 km
Not loaded
1
Hai Phong Railway Station
Nearest
11.8 km
Not loaded
2
Hanoi Railway Station
101.0 km
Not loaded
3
Vinh Railway Station
264.0 km
Not loaded
4
Dong Hoi Railway Station
369.7 km
Not loaded
5
Hue Railway Station
489.6 km
Not loaded
1
Hai Phong City
Nearest
11.0 km
Not loaded
2
Ha Long City
35.1 km
Not loaded
3
Hai Duong City
51.1 km
Not loaded
4
Nam Dinh City
77.2 km
Not loaded
5
Hung Yen City
78.3 km
Not loaded
Straight-line distance is an estimate. Road distance is calculated from the available routing service.
Investment Decision Tools
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
CIT Tax Incentive
Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt2 years
50% reduction4 years
Total incentive10 years
NĐ 218/2013/NĐ-CP
Minimum Wage Region Region 4
3.450.000 ₫/month
Hourly wage16.600 ₫
Effective from2024-07-01
Workforce & Education
Province population4,664K people
Setup Cost Estimator Interactive
Reference data — based on IP land, power, water prices and regional minimum wage 4.
Occupancy, price movements, and infrastructure status updated over time.
Recorded data
Price history chart
Quarterly rental price trends from aggregated market sources.
Loading data...
No price history is available for this type.
* Prices are indicative. Contact the industrial park management board for official quotations.
Ratings & Reviews (0)
Share practical feedback about infrastructure, service, pricing, and site experience.
0.0
0 reviews
5
0
4
0
3
0
2
0
1
0
Write a review
FAQ
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.
Investors should review land availability, lease term, infrastructure readiness, utilities, workforce access, logistics distance, management support, and applicable investment incentives before making a site visit or reservation.
Straight-line distance is estimated from map coordinates. Road distance is calculated through the routing service when you switch the Logistics Distance mode to By road.
Yes. Use the Contact / Send inquiry form on this page and include your required land area, factory size, industry, timeline, and preferred contact method.
Typical documents include company profile, proposed project scope, investment capital, land or factory demand, environmental requirements, and expected implementation schedule.
Contact / Send inquiry
Send your requirements to the industrial park team. We will route the message with the selected purpose and project details.
Login
Select Location
Filter products by location
Product successfully added to your cart!
VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.