VIIPIP Vietnam Industrial Parks
English
English Vietnamese

Phuoc Dong

Tay Ninh Province Industrial Park (Data) Saigon VRG Investment Holding Corporation http:/saigonvrg.com.vn 066.3888999 [email protected]

Phuoc Dong — 3,276ha, Tay Ninh; IP in Tay Ninh Province.

Total area
3276 ha
Land available
2190 ha
Factory available
106 m²
Land price
2.4 USD/m²
Occupancy rate33%
1,086 / 3,276 ha leased · 2,190 ha available
Land rate lower than province avg 96% (Prov. avg: 56.9)
🗺️ Province investment snapshot: Tay Ninh Province
View full profile →
3,254K
Population
8,537
km²

Overview

Address

Phuoc Dong Commune, Go Dau District & Don Thuan Commune, Trang Bang District, Tay Ninh Province

About / Location

IP located in Tay Ninh area, Tay Ninh Province (after Long An merger).

Infrastructure

Geology

  • Flat and even terrain.
  • Good bearing capacity, averagely from 1 kg/cm2 to 1.7 kg/cm2.
  • The soil composition is mainly sandy clay

Traffic

+ 6 lanes with 60m in width

Power supply

 

  Power is supplied from two sources 110/22KV:

Outside sources:

• Thanh Duc substation         capacity of 40 MVA

• Trang Bang substation        capacity of 2 x 40 MVA

   Onsite sources: total capacity of 500 MVA

• No. 1 onsite substation       capacity of 2 x 63 MVA

• No. 2 onsite substation       capacity of 2 x 63 + 40 MVA

• No. 3 onsite substation       capacity of 2 x 63 MVA

• No. 4 onsite substation       capacity of 2 x 63 MVA

Electricity charge: price offered by Electricity Company of Vietnam

Monthly payment

 

Water supply

•            On-site water treatment plant, capacity 120,000m3/day night

•            Water consumption charge $ 0.3 USD/m3

Monthly payment

 

Wastewater treatment

  •  Capacity of 90,000m3/day night, meet QCVN 24/2009/BTNMT level A, before being discharged.
  •  Waste water treatment charge $ 0.25 USD/m3                                                                       (equal to 80% of consumed clean water)
  • Large and modern center for collection and classification of garbage

Monthly payment 

 

Communication

+ IDD

Internet

FTTH fibre coverage; VNPT/Viettel/FPT/CMC services; ≥1Gbps for enterprise tenants.

Pricing

Land rental

32-35 USD/m2/48 years (to 2058)

Land payment terms

Phase 1: 30% value of lease contract a. Stage 1: within 10 working days from the signing date of Land Lease Agreement , making the payment of 10% of the total rental; b. Stage 2: within 10 working days from the date that the lessee is granted Investment Certificate: another 10%; c. Stage 3: within 10 working days from the signing date of Land Lease Contract: 10% payment. Phase 2: 70% value of the land lease contract may be paid under the following forms: • One-time Payment: within 20 working days after the two sides signed Handover Record of Rented Land. • Partial Payment: making payment over 7 years, 10% value each year, the interest rate of 8% annum. • Annual Payment : the annual payment is paid until the lease expired, interest rate of 8% annum.

Factory / Workshop

2.4 USD/m2/month

Power tariff

+ Charged by EVN

Water tariff

0.3 USD/m3

Wastewater fee

0.25 USD/m3

Service charges

Mainternance and public utility fee: $ 0.36 USD/m2/year. Payment method: annual prepayment .

Policies & Services

Policies

Corporate income tax is 20% within 10 years since Enterprise earns profits (comparel to normal area tax is 25%)

Corporate income tax free for 2 years and off 50% for the next 4 years (so tax is 10% / year) since Enterprise earns profits

After tax-incentive period, the corporate income tax is 25%.

Services

  • Investment certificate
  • Business establishment registration
  • Factory construction permit
  • Custom and accounting registration
  • On-site customs office
  •  Inland clearance depot (ICD)
  • Standard ready-built factories/ Warehouses
  •  Advanced security & fire extinguishing system
  • Petrol & LPG (liquid petrol gas) provided
  • Meals provided
  • Bus route to major locations (i.e. Ho Chi Minh City, Moc Bai Border gate…) Banks, shopping areas, schools and training centers, hospitals, administration offices…
  • Phuoc Dong IP Employment Service Center

 

Layout history (1)

Phuoc Dong IP EN
Phuoc Dong IP EN
20/03/2010

Project Location & Nearby

Searching within 5 km radius
Loading data…

Logistics Distance

Distance mode By road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1 Saigon Port Nearest 57.8 km
2 Cat Lai Port 64.0 km
3 Phu My Port 98.0 km
4 Cai Mep Port 101.3 km
5 Vung Tau Port 120.1 km
1 Binh Duong River Port Nearest 40.1 km
2 Long Binh Tan River Port 65.0 km
3 Dong Nai River Port 75.8 km
4 My Tho River Port 86.3 km
5 Vinh Long River Port 106.2 km
1 Tan Son Nhat Int. Airport Nearest 49.9 km
2 Long Thanh Airport (future) 84.6 km
3 Can Tho Int. Airport (VCA) 135.6 km
4 Rach Gia Airport (VKG) 185.9 km
5 Lien Khuong Airport (DLI) 231.4 km
1 HCM - Moc Bai Expressway (CT18) Nearest 26.2 km
2 HCM - Chon Thanh Expressway (CT17) 36.3 km
3 HCM - Trung Luong Expressway (CT15) 57.6 km
4 Ben Luc - Long Thanh Expressway (CT16) 61.6 km
5 HCM - Long An - Tien Giang Expressway 67.1 km
1 Saigon Railway Station Nearest 54.3 km
2 Bien Hoa Railway Station 57.2 km
3 Nha Trang Railway Station 334.3 km
4 Da Nang Railway Station 584.6 km
5 Hue Railway Station 607.9 km
1 Thu Dau Mot City Nearest 38.6 km
2 HCMC Center 56.5 km
3 Bien Hoa City 58.7 km
4 Tan An City 67.9 km
5 My Tho City 87.2 km
Straight-line distance is an estimate. Road distance is calculated from the available routing service.

Investment Decision Tools

Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.

CIT Tax Incentive

Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt 2 years
50% reduction 4 years
Total incentive 10 years
NĐ 218/2013/NĐ-CP

Minimum Wage Region Region 4

3.450.000 ₫/month
Hourly wage 16.600 ₫
Effective from 2024-07-01

Workforce & Education

Province population 3,254K people

Setup Cost Estimator Interactive

Reference data — based on IP land, power, water prices and regional minimum wage 4.

Login Log in to save calculation scenarios.

Data sources & verification

Data Source Last verified Status
Overview & legal Not provided Not verified Unverified
Prices & fees Not provided Not verified Unverified
Available land & occupancy Not provided Not verified Unverified
Infrastructure Not provided Not verified Unverified
Logistics Not provided Not verified Unverified

Industrial Park Transparency

Occupancy, price movements, and infrastructure status updated over time.

Recorded data

Occupancy rate

65.2%
Land available
2,136.0 ha
Leased
1,140.1 ha
Available
Recent trend
Updated: 01/05/2026

Price history chart

Quarterly rental price trends from aggregated market sources.

Loading data...

* Prices are indicative. Contact the industrial park management board for official quotations.

Ratings & Reviews (0)

Share practical feedback about infrastructure, service, pricing, and site experience.

0.0
0 reviews
5
0
4
0
3
0
2
0
1
0

Write a review

Guest reviews are moderated before publishing.

FAQ

Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.

VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.