Nguyen Trung Truc Street, Ben Luc Town, Ben Luc Dist., Long An Province
About / Location
Infrastructure
Geology
Asphaltroad
Traffic
Main road: standard H30
Power supply
- Ben Luc substation: 110/22KV, capital 40 + 63 MVA.
- Rach Chanh - Can Duoc substation: 40MVA.
Water supply
In addition to the industrial park water supply 3.600 m3/day, the more power from two plants: Water Plant Go Den 7.200 m2/day and Hoang Long water plant 10.000m3/day
Wastewater treatment
Land area 7.000m2.
Capacity of phase 1: 6.000 m3/day.
Capacity of phase 2: 6.000m3/day.
Wastewater standard of Enterprises: standard B – QCVN 40:2011/BTNMT.
Ensure the provision of telephone, fax, internet ... for investors
Internet
FTTH fibre coverage; VNPT/Viettel/FPT/CMC services; ≥1Gbps for enterprise tenants.
Pricing
Land rental
75 – 80 USD/m2
Land payment terms
flexible, 2 months up to 4 years
Factory / Workshop
2.5 USD/m2
Water tariff
0.5 usd/m3
Service charges
Management and Infrastructure fees : 0.03USD/m2/month
Policies & Services
Policies
CIT incentive: 10% for 15 years, 4-year exemption + 50% reduction for 9 more years (Law on Investment 2020). 11-year land rent exemption. HCM-belt IPs benefit from strong logistics infrastructure.
Distance modeBy road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1
Saigon Port
Nearest
56.5 km
Not loaded
2
Cat Lai Port
65.2 km
Not loaded
3
Can Tho Port
80.3 km
Not loaded
4
Phu My Port
90.3 km
Not loaded
5
Cai Mep Port
91.4 km
Not loaded
1
My Tho River Port
Nearest
33.4 km
Not loaded
2
Vinh Long River Port
48.7 km
Not loaded
3
Binh Duong River Port
64.7 km
Not loaded
4
Long Binh Tan River Port
82.7 km
Not loaded
5
Dong Nai River Port
93.4 km
Not loaded
1
Tan Son Nhat Int. Airport
Nearest
53.7 km
Not loaded
2
Can Tho Int. Airport (VCA)
80.9 km
Not loaded
3
Long Thanh Airport (future)
92.4 km
Not loaded
4
Rach Gia Airport (VKG)
139.1 km
Not loaded
5
Con Dao Airport (VCS)
215.5 km
Not loaded
1
HCM - Long An - Tien Giang Expressway
Nearest
8.3 km
Not loaded
2
HCM - Trung Luong Expressway (CT15)
15.4 km
Not loaded
3
Trung Luong - My Thuan Expressway (CT21)
33.6 km
Not loaded
4
HCM - Moc Bai Expressway (CT18)
54.2 km
Not loaded
5
My Thuan - Can Tho Expressway (CT22)
58.3 km
Not loaded
1
Saigon Railway Station
Nearest
54.1 km
Not loaded
2
Bien Hoa Railway Station
76.7 km
Not loaded
3
Nha Trang Railway Station
371.8 km
Not loaded
4
Da Nang Railway Station
643.1 km
Not loaded
5
Hue Railway Station
666.7 km
Not loaded
1
Tan An City
Nearest
24.6 km
Not loaded
2
My Tho City
34.3 km
Not loaded
3
Ben Tre City
47.1 km
Not loaded
4
Vinh Long City
48.7 km
Not loaded
5
HCMC Center
56.4 km
Not loaded
Straight-line distance is an estimate. Road distance is calculated from the available routing service.
Investment Decision Tools
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
CIT Tax Incentive
Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt2 years
50% reduction4 years
Total incentive10 years
NĐ 218/2013/NĐ-CP
Minimum Wage Region Region 4
3.450.000 ₫/month
Hourly wage16.600 ₫
Effective from2024-07-01
Workforce & Education
Province population3,254K people
Setup Cost Estimator Interactive
Reference data — based on IP land, power, water prices and regional minimum wage 4.
Occupancy, price movements, and infrastructure status updated over time.
Recorded data
Price history chart
Quarterly rental price trends from aggregated market sources.
Loading data...
No price history is available for this type.
* Prices are indicative. Contact the industrial park management board for official quotations.
Ratings & Reviews (0)
Share practical feedback about infrastructure, service, pricing, and site experience.
0.0
0 reviews
5
0
4
0
3
0
2
0
1
0
Write a review
FAQ
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.
Investors should review land availability, lease term, infrastructure readiness, utilities, workforce access, logistics distance, management support, and applicable investment incentives before making a site visit or reservation.
Straight-line distance is estimated from map coordinates. Road distance is calculated through the routing service when you switch the Logistics Distance mode to By road.
Yes. Use the Contact / Send inquiry form on this page and include your required land area, factory size, industry, timeline, and preferred contact method.
Typical documents include company profile, proposed project scope, investment capital, land or factory demand, environmental requirements, and expected implementation schedule.
Contact / Send inquiry
Send your requirements to the industrial park team. We will route the message with the selected purpose and project details.
Login
Select Location
Filter products by location
Product successfully added to your cart!
VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.