VIIPIP Vietnam Industrial Parks
English
English Vietnamese

An Khanh Industrial Park (Planned)

Ha Noi Industrial Park (Data) An Khanh IP Management Board – Hoai Duc https://www.hoaiduc.hanoi.gov.vn (+84-24) 3364 5000 [email protected]

Small-scale 15.3-ha planned industrial park in Hoai Duc District, western Hanoi, adjacent to Thang Long Boulevard. Targets local light manufacturing and small businesses near Hoa Lac Hi-Tech Park.

Total area
15.3 ha
Land available
15.3 ha
Land price
100 USD/m²
Occupancy rate0%
0 / 15 ha leased · 15 ha available
Land rate higher than province avg 14% (Prov. avg: 88.0)
🗺️ Province investment snapshot: Ha Noi
View full profile →
8,808K
Population
8.1M
Income/mo
67.1
PCI
$41.2B
FDI stock
579
Wards
3,360
km²
105km
To port

Overview

Address

An Khanh Commune, Hoai Duc District, Hanoi

About / Location

Hoai Duc District, 15 km west of central Hanoi, along Thang Long Boulevard. An Khanh Commune is a fast-growing suburban area. Flat terrain with good road access via Ring Road 3.5 (planned) and Ring Road 4 (under construction).

Infrastructure

Geology

Flat alluvial/suburban terrain. Foundation bearing capacity 1.5–2.0 kg/cm². Standard pile or strip foundations suitable.

Traffic

• Thang Long Boulevard – directly adjacent • Ring Road 3.5 (planned) – 3 km • Ring Road 4 (under construction) – 8 km • Hoa Lac Hi-Tech Park – 15 km • Hanoi city centre – 20 km • Noi Bai Airport – 40 km

Power supply

22 kV local distribution via Hoai Duc substation. Planned: 1×10 MVA transformer.

Water supply

Hoai Duc water network connection. Estimated capacity: 600 m³/day (small park).

Wastewater treatment

Small centralised WTP: 500 m³/day to QCVN 40:2011 Class B.

Communication

IDD telephone and fibre network. Full 4G/5G mobile coverage.

Internet

High-speed fibre internet (VNPT, Viettel, FPT) throughout the park. Dedicated fibre up to 10 Gbps for enterprises.

Pricing

Land rental

Land lease price: approximately USD 100/m² for the full 50-year lease term (reference). Minimum plot 2,000 m².

Factory / Workshop

No ready-built workshops (land-only or planned).

Power tariff

EVN North 2025 industrial tariff (medium voltage): • Off-peak (22:00–06:00): 1,079 VND/kWh • Normal hours: 1,672 VND/kWh • Peak hours (09:30–11:30, 17:00–20:00): 2,985 VND/kWh

Water tariff

Industrial water supply: 15,000 VND/m³. Wastewater treatment: 9,000 VND/m³.

Wastewater fee

Small centralised WTP: 500 m³/day to QCVN 40:2011 Class B.

Service charges

Infrastructure service fee: USD 0.4–0.5/m²/month (land area basis).

Policies & Services

Policies

• 50-year land lease • Suitable for local light manufacturing and artisan industry upgrade • Standard KCN CIT incentives • Supply-chain synergy with Hoa Lac HHTP cluster

Special incentives

• 50-year land lease • Suitable for local light manufacturing and artisan industry upgrade • Standard KCN CIT incentives • Supply-chain synergy with Hoa Lac HHTP cluster

Project Location & Nearby

Searching within 5 km radius
Loading data…

Logistics Distance

Distance mode By road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1 Hai Phong Port Nearest 106.3 km
2 Cai Lan Port 143.5 km
3 Nghi Son Port 181.4 km
4 Vung Ang Port 338.5 km
5 Chan May Port 577.1 km
1 Hanoi River Port Nearest 22.2 km
2 Viet Tri River Port 40.8 km
3 Nam Dinh River Port 85.3 km
4 Ninh Binh River Port 91.1 km
5 Binh Duong River Port 1,121.9 km
1 Noi Bai Int. Airport Nearest 25.5 km
2 Cat Bi Int. Airport 112.0 km
3 Tho Xuan Airport (THD) 127.3 km
4 Vinh Airport (VII) 255.0 km
5 Dong Hoi Airport (VDH) 402.7 km
1 Hanoi - Hoa Binh Expressway (CT07) Nearest 19.7 km
2 Hanoi - Thai Nguyen Expressway (CT02) 29.1 km
3 Hanoi - Bac Giang Expressway (CT05) 46.5 km
4 Hanoi - Hai Phong Expressway (CT03) 56.2 km
5 CT01 Expressway: Phap Van - Ninh Binh 61.3 km
1 Hanoi Railway Station Nearest 17.8 km
2 Hai Phong Railway Station 107.4 km
3 Vinh Railway Station 262.0 km
4 Dong Hoi Railway Station 406.1 km
5 Hue Railway Station 546.1 km
1 Hanoi Center Nearest 19.1 km
2 Hoa Binh City 42.0 km
3 Viet Tri City 42.7 km
4 Bac Ninh City 45.5 km
5 Hung Yen City 58.3 km
Straight-line distance is an estimate. Road distance is calculated from the available routing service.

Investment Decision Tools

Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.

CIT Tax Incentive

Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt 2 years
50% reduction 4 years
Total incentive 10 years
NĐ 218/2013/NĐ-CP

Minimum Wage Region Region 4

3.450.000 ₫/month
Hourly wage 16.600 ₫
Effective from 2024-07-01

Workforce & Education

Province population 8,808K people

Setup Cost Estimator Interactive

Reference data — based on IP land, power, water prices and regional minimum wage 4.

Login Log in to save calculation scenarios.

Data sources & verification

Data Source Last verified Status
Overview & legal Not provided Not verified Unverified
Prices & fees Not provided Not verified Unverified
Available land & occupancy Not provided Not verified Unverified
Infrastructure Not provided Not verified Unverified
Logistics Not provided Not verified Unverified

Industrial Park Transparency

Occupancy, price movements, and infrastructure status updated over time.

Recorded data

Price history chart

Quarterly rental price trends from aggregated market sources.

Loading data...

* Prices are indicative. Contact the industrial park management board for official quotations.

Ratings & Reviews (0)

Share practical feedback about infrastructure, service, pricing, and site experience.

0.0
0 reviews
5
0
4
0
3
0
2
0
1
0

Write a review

Guest reviews are moderated before publishing.

FAQ

Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.

VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.