Phường Hòa Phú - Thị Xã Thủ Dầu Một - Tỉnh Bình Dương
Infrastructure
Geology
•• The landscape is pretty flat, stiff down from North West to South East • Average altitude 28-32 meter above sea level, absolutely no earthquake or flood • Soil loadability average at 2.5kg/cm2 and above, saving significant construction cost for investors • Average temperature 26.7oC, highest 33 oC in March/April, lowest 22 oC in December • Average humidity @ 82% • Annual rain level 1882mm • Annual sunlight time 2,526 hours
Traffic
Width: 23-28m
Power supply
• Power supply: Dong An II IP is supplied from national grid with capacity of 120 MW/day, 100/22 KV transformer station, 22Kv overhead wire run to each land slot
Water supply
Waste treatment: the waste water treatment plant of 3,000 m3/day is 80% completed, and a solid waste collection and transfer station is being constructed, guaranteeing the environment protection the the industrial park
Wastewater treatment
Waste treatment: the waste water treatment plant of 3,000 m3/day is 80% completed, and a solid waste collection and transfer station is being constructed, guaranteeing the environment protection the the industrial park
Internet
• Telecommunication cable including optical cable for high speed internet are installed and ready for services
Policies & Services
Investment process
The investment processes:
1. The investors sign in the understanding memorandums of land lease in Dong An IP.
2. The customer service team of Dong An IP supplies the registration forms and guides the investors to complete the forms.
3. The investors send all full related documents to the customer service team of Dong An IP.
4. Dong An customer service team submits the documents to the authorities to apply for business license (local) or Certificate of investment (FDI projects).
5. Two weeks from the date of submitting the documents, legal representatives of the investors will be guided to receive the investment license from the authorities. Dong An staffs can also take care of this step if so requested by a power of attorney issued by investor.
6. Dong An customer service team guides the investors to complete the procedures of registering legal stamps at police office and tax codes at tax office.
After getting the business licenses and the stamps, the investors can start their operation, with some key steps described as followed:
7. Open bank accounts.
9. Land hand-over.
10. Conduct Soil Survey.
11. Complete detail design of the factory, including Fire protection system.
12.Prepare Environmental Impact Assessment of Environment Protection Commitment and get approved.
13. Get Fire protection system design approved by Binh Duong Fire Police
14. Apply for construction permit at Binh Duong Industrial Parks Authority (BDIZA).
17. Start construction.
18. Submit Construction Completion report and get approved by BDIZA.
Services
• The service area of the industrial park with the purpose to serve leisure needs of investors like hotel, restaurant, tennis court and swimming pool, especially the golf driving range, is also being developed and will be ready for use by mid 2009.
• There will be banks, post office within the industrial park serving your business needs.
• We offer to the investors end-to-end supply chain related services like investment license (free of charge), human resources recruiting, supply and management, customs clearance and transportation, catering service, waste collection and treatment, training of skilful workforce (via our own Dong An Polytechnic nearby)…
Distance modeBy road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1
Saigon Port
Nearest
39.8 km
Not loaded
2
Cat Lai Port
40.7 km
Not loaded
3
Phu My Port
70.8 km
Not loaded
4
Cai Mep Port
74.8 km
Not loaded
5
Vung Tau Port
96.5 km
Not loaded
1
Binh Duong River Port
Nearest
15.1 km
Not loaded
2
Long Binh Tan River Port
30.7 km
Not loaded
3
Dong Nai River Port
39.7 km
Not loaded
4
My Tho River Port
91.8 km
Not loaded
5
Vinh Long River Port
124.4 km
Not loaded
1
Tan Son Nhat Int. Airport
Nearest
33.9 km
Not loaded
2
Long Thanh Airport (future)
51.6 km
Not loaded
3
Can Tho Int. Airport (VCA)
157.2 km
Not loaded
4
Lien Khuong Airport (DLI)
195.7 km
Not loaded
5
Rach Gia Airport (VKG)
213.9 km
Not loaded
1
HCM - Chon Thanh Expressway (CT17)
Nearest
14.8 km
Not loaded
2
Ben Luc - Long Thanh Expressway (CT16)
40.8 km
Not loaded
3
Long Thanh - Dau Giay Expressway (CT25)
43.8 km
Not loaded
4
HCM - Moc Bai Expressway (CT18)
64.4 km
Not loaded
5
HCM - Trung Luong Expressway (CT15)
67.1 km
Not loaded
1
Bien Hoa Railway Station
Nearest
24.1 km
Not loaded
2
Saigon Railway Station
37.9 km
Not loaded
3
Nha Trang Railway Station
299.7 km
Not loaded
4
Da Nang Railway Station
574.2 km
Not loaded
5
Hue Railway Station
602.3 km
Not loaded
1
Thu Dau Mot City
Nearest
16.3 km
Not loaded
2
Bien Hoa City
24.8 km
Not loaded
3
HCMC Center
38.4 km
Not loaded
4
Tan An City
72.2 km
Not loaded
5
My Tho City
92.6 km
Not loaded
Straight-line distance is an estimate. Road distance is calculated from the available routing service.
Investment Decision Tools
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
CIT Tax Incentive
Tax rate
17%
Ưu đãi tại Bình Dương – VSIP
100% exempt2 years
50% reduction4 years
Total incentive10 years
NĐ 218/2013/NĐ-CP
Minimum Wage Region Region 4
3.450.000 ₫/month
Hourly wage16.600 ₫
Effective from2024-07-01
Workforce & Education
Province population14,003K people
Setup Cost Estimator Interactive
Reference data — based on IP land, power, water prices and regional minimum wage 4.
Occupancy, price movements, and infrastructure status updated over time.
Recorded data
Price history chart
Quarterly rental price trends from aggregated market sources.
Loading data...
No price history is available for this type.
* Prices are indicative. Contact the industrial park management board for official quotations.
Ratings & Reviews (0)
Share practical feedback about infrastructure, service, pricing, and site experience.
0.0
0 reviews
5
0
4
0
3
0
2
0
1
0
Write a review
FAQ
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.
Investors should review land availability, lease term, infrastructure readiness, utilities, workforce access, logistics distance, management support, and applicable investment incentives before making a site visit or reservation.
Straight-line distance is estimated from map coordinates. Road distance is calculated through the routing service when you switch the Logistics Distance mode to By road.
Yes. Use the Contact / Send inquiry form on this page and include your required land area, factory size, industry, timeline, and preferred contact method.
Typical documents include company profile, proposed project scope, investment capital, land or factory demand, environmental requirements, and expected implementation schedule.
Contact / Send inquiry
Send your requirements to the industrial park team. We will route the message with the selected purpose and project details.