VIIPIP Vietnam Industrial Parks
English
English Vietnamese

VSIP III Industrial Park Verified Industrial Park This industrial park profile has been checked and verified by the Ocean team.

Ho Chi Minh City Industrial Park (Data) Vietnam – Singapore Industrial Park Joint – Venture Co. Ltd. vsip.com.vn 0274.3743.898 [email protected]

The 3rd Vietnam-Singapore IP joint venture (Becamex × Sembcorp). 1,000 ha green IP, anchor tenant LEGO Group with USD 1.3B factory.

Total area
1000 ha
Land price
145 USD/m²
Land rate higher than province avg 73% (Prov. avg: 83.7)
🗺️ Province investment snapshot: Ho Chi Minh City
View full profile →
14,003K
Population
9.2M
Income/mo
66.2
PCI
$58.4B
FDI stock
312
Wards
6,773
km²
5km
To port

Overview

Address

Hoi Nghia Ward, Tan Uyen, HCMC (former Binh Duong)

About / Location

Vietnam-Singapore Industrial Park III (VSIP III) is the third VSIP joint venture between Becamex IDC and Singapore Sembcorp Industries. Located in Tan Uyen (former Binh Duong, now HCMC after the 2025 merger), VSIP III is a 1,000 ha green industrial park inaugurated in 2022.

VSIP III is anchored by LEGO Group USD 1.3 billion carbon-neutral factory — the company 6th globally — symbolizing the park sustainability orientation.

Infrastructure

Traffic

  • Connects to NH 13 and DT 747B
  • 30 km to HCMC center · 45 km to Cai Mep Port
  • 40 km to Tan Son Nhat Airport · 60 km to Long Thanh Airport (future)

Power supply

2x110 kV substation, total capacity 2x125 MVA. Solar rooftop initiative for tenants.

Water supply

Internal water plant: 25,000 m³/day with reverse-osmosis system.

Wastewater treatment

WWTP: 15,000 m³/day Class A QCVN 40:2011/BTNMT.

Internet

Full FTTH/FTTB fiber by VNPT, Viettel and dedicated leased lines.

Policies & Services

Policies

Standard IP incentives. Green/carbon-neutral tenants receive additional support from Becamex.

Project Location & Nearby

Searching within 5 km radius
Loading data…

Logistics Distance

Distance mode By road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1 Cat Lai Port Nearest 36.4 km
2 Saigon Port 37.9 km
3 Phu My Port 63.3 km
4 Cai Mep Port 67.4 km
5 Vung Tau Port 89.6 km
1 Binh Duong River Port Nearest 17.4 km
2 Long Binh Tan River Port 21.6 km
3 Dong Nai River Port 29.4 km
4 My Tho River Port 93.9 km
5 Vinh Long River Port 129.2 km
1 Tan Son Nhat Int. Airport Nearest 33.9 km
2 Long Thanh Airport (future) 42.3 km
3 Can Tho Int. Airport (VCA) 162.5 km
4 Lien Khuong Airport (DLI) 187.1 km
5 Rach Gia Airport (VKG) 220.7 km
1 HCM - Chon Thanh Expressway (CT17) Nearest 22.5 km
2 Long Thanh - Dau Giay Expressway (CT25) 33.2 km
3 Ben Luc - Long Thanh Expressway (CT16) 37.6 km
4 Bien Hoa - Vung Tau Expressway (CT19) 63.2 km
5 HCM - Trung Luong Expressway (CT15) 71.2 km
1 Bien Hoa Railway Station Nearest 16.7 km
2 Saigon Railway Station 36.9 km
3 Nha Trang Railway Station 291.6 km
4 Da Nang Railway Station 574.0 km
5 Hue Railway Station 603.6 km
1 Bien Hoa City Nearest 16.7 km
2 Thu Dau Mot City 19.5 km
3 HCMC Center 36.7 km
4 Tan An City 74.7 km
5 Vung Tau City 85.3 km
Straight-line distance is an estimate. Road distance is calculated from the available routing service.

Investment Decision Tools

Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.

CIT Tax Incentive

Tax rate
17%
Ưu đãi tại Bình Dương – VSIP
100% exempt 2 years
50% reduction 4 years
Total incentive 10 years
NĐ 218/2013/NĐ-CP

Minimum Wage Region Region 4

3.450.000 ₫/month
Hourly wage 16.600 ₫
Effective from 2024-07-01

Workforce & Education

Province population 14,003K people

Setup Cost Estimator Interactive

Reference data — based on IP land, power, water prices and regional minimum wage 4.

Login Log in to save calculation scenarios.

Data sources & verification

Data Source Last verified Status
Overview & legal Not provided Not verified Unverified
Prices & fees Not provided Not verified Unverified
Available land & occupancy Not provided Not verified Unverified
Infrastructure Not provided Not verified Unverified
Logistics Not provided Not verified Unverified

Industrial Park Transparency

Occupancy, price movements, and infrastructure status updated over time.

Recorded data

Occupancy rate

85.4%
Filling quickly
854.0 ha
Leased
146.0 ha
Available
Recent trend
Updated: 01/05/2026

Price movement

Land rent
USD/m²/year · 01/01/2026
147.00
USD
Factory rent
USD/m²/year · 01/01/2026
6.50
USD
Water price
VND/m³ · 01/01/2026
12,000.00
VND
Power price
VND/kWh · 01/01/2026
2,400.00
VND
Prices may vary by area, location, and lease term.

Price history chart

Quarterly rental price trends from aggregated market sources.

Loading data...

* Prices are indicative. Contact the industrial park management board for official quotations.

Ratings & Reviews (0)

Share practical feedback about infrastructure, service, pricing, and site experience.

0.0
0 reviews
5
0
4
0
3
0
2
0
1
0

Write a review

Guest reviews are moderated before publishing.

FAQ

Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.

VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.