Located at Long An, Loc An and Binh Son wards, Long Thanh district, Dong Nai province, location in corridor of National route 51
About / Location
Located at Long An, Loc An and Binh Son wards, Long Thanh district, Dong Nai province, location in corridor of National route 51.
- The North near by ĐT 769 (internal road No.10) Long Thanh - Dau Giay Expressway and one part near by internal road No.25 to Dau Giay.
- The South land in crop (separate distance HCMC - Long Thanh - Dau Giay Expressway).
- The East near by Binh Son Urban
- The West is Loc An residential quarter.
Infrastructure
Geology
- Topography at the fairy high area.
- Land characteristic: hard structure and stone, advantages for construction factory
Traffic
Asphaltic concrete roads with loading capacity from 10 to 12 tons, including:
- Main road:
+ type 1: width of road 39m
+ type 2: width of road 36m
Power supply
Electricity source is supplied by 220/110KV Long Thanh transformer station and National grid ensuring that supply 22 KV electricity source 24/24 hours to the fence of factories.
Water supply
Clean water is supplied by Nhon Trach - Thien Tan water plant with capacity is 100.000 m3/day ensuring that supply water 24/24 hours to the fence of factories.
Wastewater treatment
We have waste water treatment factory for all the factories in IZ with the capacity 9.200 m3/day, reach to standard TCVN 5945-2005 colum A.
Internet
Information system ensure communicating in country and International easily, including telephone, mobile phone, fax, internet,... time for supply this service from 7-10 days
Pricing
Land rental
* Land rental pay annually accordance with state
* Using infrastructure cost:
- Infrastructure fee: 0.5 USD/m2/ year;
- Land using fee: 1,500 VND/m2/year
(All cost above are not inclusive of VAT ).
These above fees are applied for the customers who sign land leased contract before 01/01/2011.
Land payment terms
"Payment methods:
- One time payment for whole duration;
- Annual payment;
- Installment payment in 5 years."
Wastewater fee
Expectation of waste water treatment price: 0,28 USD/m3
Distance modeBy road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1
Cat Lai Port
Nearest
22.1 km
Not loaded
2
Phu My Port
24.1 km
Not loaded
3
Cai Mep Port
28.3 km
Not loaded
4
Saigon Port
31.0 km
Not loaded
5
Vung Tau Port
51.0 km
Not loaded
1
Dong Nai River Port
Nearest
16.1 km
Not loaded
2
Long Binh Tan River Port
18.6 km
Not loaded
3
Binh Duong River Port
40.7 km
Not loaded
4
My Tho River Port
83.8 km
Not loaded
5
Vinh Long River Port
126.3 km
Not loaded
1
Long Thanh Airport (future)
Nearest
5.2 km
Not loaded
2
Tan Son Nhat Int. Airport
36.1 km
Not loaded
3
Can Tho Int. Airport (VCA)
160.3 km
Not loaded
4
Lien Khuong Airport (DLI)
184.2 km
Not loaded
5
Rach Gia Airport (VKG)
223.2 km
Not loaded
1
Long Thanh - Dau Giay Expressway (CT25)
Nearest
18.6 km
Not loaded
2
Bien Hoa - Vung Tau Expressway (CT19)
25.5 km
Not loaded
3
Ben Luc - Long Thanh Expressway (CT16)
26.3 km
Not loaded
4
HCM - Chon Thanh Expressway (CT17)
62.6 km
Not loaded
5
HCM - Trung Luong Expressway (CT15)
72.3 km
Not loaded
1
Bien Hoa Railway Station
Nearest
24.8 km
Not loaded
2
Saigon Railway Station
34.0 km
Not loaded
3
Nha Trang Railway Station
289.5 km
Not loaded
4
Da Nang Railway Station
601.3 km
Not loaded
5
Hue Railway Station
634.2 km
Not loaded
1
Bien Hoa City
Nearest
24.1 km
Not loaded
2
HCMC Center
31.4 km
Not loaded
3
Thu Dau Mot City
42.1 km
Not loaded
4
Vung Tau City
45.6 km
Not loaded
5
Tan An City
69.1 km
Not loaded
Straight-line distance is an estimate. Road distance is calculated from the available routing service.
Investment Decision Tools
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
CIT Tax Incentive
Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt2 years
50% reduction4 years
Total incentive10 years
NĐ 218/2013/NĐ-CP
Minimum Wage Region Region 4
3.450.000 ₫/month
Hourly wage16.600 ₫
Effective from2024-07-01
Workforce & Education
Province population4,491K people
Setup Cost Estimator Interactive
Reference data — based on IP land, power, water prices and regional minimum wage 4.
Occupancy, price movements, and infrastructure status updated over time.
Recorded data
Price history chart
Quarterly rental price trends from aggregated market sources.
Loading data...
No price history is available for this type.
* Prices are indicative. Contact the industrial park management board for official quotations.
Ratings & Reviews (0)
Share practical feedback about infrastructure, service, pricing, and site experience.
0.0
0 reviews
5
0
4
0
3
0
2
0
1
0
Write a review
FAQ
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.
Investors should review land availability, lease term, infrastructure readiness, utilities, workforce access, logistics distance, management support, and applicable investment incentives before making a site visit or reservation.
Straight-line distance is estimated from map coordinates. Road distance is calculated through the routing service when you switch the Logistics Distance mode to By road.
Yes. Use the Contact / Send inquiry form on this page and include your required land area, factory size, industry, timeline, and preferred contact method.
Typical documents include company profile, proposed project scope, investment capital, land or factory demand, environmental requirements, and expected implementation schedule.
Contact / Send inquiry
Send your requirements to the industrial park team. We will route the message with the selected purpose and project details.
Login
Select Location
Filter products by location
Product successfully added to your cart!
VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.