Tan Truong Expanded IP (112.6 ha) is an extension of the existing Tan Truong IP, developed by Tay Bac Industry JSC. Investment policy approved 29/8/2024 by Hai Duong authorities.
Located adjacent to existing Tan Truong IP (id 165), Cam Giang district (former Hai Duong province), now Hai Phong City. Near QL5 (Hanoi – Hai Phong corridor). Distance to Hanoi ~58 km; Hai Phong port ~55 km; Cat Bi airport ~55 km.
Infrastructure
Traffic
QL5 (Hanoi – Hai Phong); Hanoi – Hai Phong expressway (Cam Giang exit nearby). Distance: Hanoi ~58 km; Hai Phong port ~55 km; Cat Bi airport ~55 km.
Power supply
110/22 kV substation shared with Tan Truong IP; 3-phase. Off-peak 1,200; Normal 1,900; Peak 2,900 VND/kWh.
Water supply
Water from Cam Giang regional plant; capacity meets industrial demand.
Wastewater treatment
Joint wastewater treatment with Tan Truong IP; QCVN 40:2011 col A; 12,500 VND/m³.
Communication
Fibre-optic internet; full telecom from major Vietnamese operators.
Pricing
Land rental
Land lease: ~65 USD/m² (50-year term). Minimum plot 1 ha.
Factory / Workshop
Ready-built factory: ~4.5 USD/m²/month.
Power tariff
Off-peak 1,200 VND/kWh; Normal 1,900 VND/kWh; Peak 2,900 VND/kWh.
Water tariff
Water: 11,000 VND/m³.
Wastewater fee
Wastewater treatment: 12,500 VND/m³.
Service charges
Service fee: 0.45 USD/m²/year.
Policies & Services
Policies
CIT incentive: 17% for 10 years; 2-year exemption + 50% reduction for 4 years. Land rent exemption per government policy for new IP. Import duty exemption on fixed-asset machinery.
Distance modeBy road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1
Hai Phong Port
Nearest
46.9 km
Not loaded
2
Cai Lan Port
85.0 km
Not loaded
3
Nghi Son Port
178.3 km
Not loaded
4
Vung Ang Port
319.2 km
Not loaded
5
Chan May Port
544.8 km
Not loaded
1
Hanoi River Port
Nearest
37.5 km
Not loaded
2
Nam Dinh River Port
58.6 km
Not loaded
3
Ninh Binh River Port
80.2 km
Not loaded
4
Viet Tri River Port
95.0 km
Not loaded
5
Binh Duong River Port
1,107.6 km
Not loaded
1
Cat Bi Int. Airport
Nearest
52.8 km
Not loaded
2
Noi Bai Int. Airport
54.1 km
Not loaded
3
Tho Xuan Airport (THD)
140.3 km
Not loaded
4
Vinh Airport (VII)
251.9 km
Not loaded
5
Dong Hoi Airport (VDH)
382.7 km
Not loaded
1
Hanoi - Hai Phong Expressway (CT03)
Nearest
3.6 km
Not loaded
2
Hanoi - Bac Giang Expressway (CT05)
35.4 km
Not loaded
3
Hanoi - Thai Nguyen Expressway (CT02)
40.0 km
Not loaded
4
Hanoi - Hoa Binh Expressway (CT07)
54.0 km
Not loaded
5
CT01 Expressway: Phap Van - Ninh Binh
58.8 km
Not loaded
1
Hanoi Railway Station
Nearest
41.8 km
Not loaded
2
Hai Phong Railway Station
48.1 km
Not loaded
3
Vinh Railway Station
258.6 km
Not loaded
4
Dong Hoi Railway Station
386.1 km
Not loaded
5
Hue Railway Station
517.3 km
Not loaded
1
Hai Duong City
Nearest
8.5 km
Not loaded
2
Bac Ninh City
31.8 km
Not loaded
3
Hung Yen City
37.7 km
Not loaded
4
Hanoi Center
40.5 km
Not loaded
5
Hai Phong City
48.4 km
Not loaded
Straight-line distance is an estimate. Road distance is calculated from the available routing service.
Investment Decision Tools
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
CIT Tax Incentive
Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt2 years
50% reduction4 years
Total incentive10 years
NĐ 218/2013/NĐ-CP
Minimum Wage Region Region 4
3.450.000 ₫/month
Hourly wage16.600 ₫
Effective from2024-07-01
Workforce & Education
Province population4,664K people
Setup Cost Estimator Interactive
Reference data — based on IP land, power, water prices and regional minimum wage 4.
Occupancy, price movements, and infrastructure status updated over time.
Recorded data
Price history chart
Quarterly rental price trends from aggregated market sources.
Loading data...
No price history is available for this type.
* Prices are indicative. Contact the industrial park management board for official quotations.
Ratings & Reviews (0)
Share practical feedback about infrastructure, service, pricing, and site experience.
0.0
0 reviews
5
0
4
0
3
0
2
0
1
0
Write a review
FAQ
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.
Investors should review land availability, lease term, infrastructure readiness, utilities, workforce access, logistics distance, management support, and applicable investment incentives before making a site visit or reservation.
Straight-line distance is estimated from map coordinates. Road distance is calculated through the routing service when you switch the Logistics Distance mode to By road.
Yes. Use the Contact / Send inquiry form on this page and include your required land area, factory size, industry, timeline, and preferred contact method.
Typical documents include company profile, proposed project scope, investment capital, land or factory demand, environmental requirements, and expected implementation schedule.
Contact / Send inquiry
Send your requirements to the industrial park team. We will route the message with the selected purpose and project details.
Login
Select Location
Filter products by location
Product successfully added to your cart!
VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.