VIIPIP Vietnam Industrial Parks
English
English Vietnamese

Thanh Mien Industrial Park

Hai Phong Industrial Park (Data) Thanh Mien Industrial Park Investment JSC +84 220 3770 888 [email protected]

Thanh Mien IP (226 ha) is a planned industrial zone in Thanh Mien district, Hai Phong City (former Hai Duong province), targeting light manufacturing, agro-processing, textiles and supporting industries. Plot sizes 2–10 ha; 50-year lease term.

Total area
226 ha
Land price
50 USD/m²
Occupancy rate100%
226 / 226 ha leased · 0 ha available
Land rate lower than province avg 36% (Prov. avg: 78.4)
🗺️ Province investment snapshot: Hai Phong
View full profile →
4,664K
Population
7.1M
Income/mo
70.2
PCI
$29.8B
FDI stock
217
Wards
3,195
km²
0km
To port

Overview

Address

Thanh Mien district, Hai Phong City

About / Location

Located in Doan Ket, Le Hong and Hong Quang communes, Thanh Mien district (former Hai Duong province, southern area), now Hai Phong City. Thanh Mien 2 (200 ha) is also being planned nearby. Distance to Hai Phong port ~55 km; Cat Bi airport ~60 km.

Infrastructure

Traffic

QL38B; QL17; connects to QL5 and Hanoi – Hai Phong expressway network. Hai Phong port ~55 km; Cat Bi airport ~60 km; Hanoi ~85 km.

Power supply

Grid power 110/22 kV; 3-phase. Off-peak 1,200 VND/kWh; Normal 1,900 VND/kWh; Peak 2,900 VND/kWh.

Water supply

Water from Thanh Mien municipal plant; clean water supply for industrial use.

Wastewater treatment

Centralised wastewater treatment to QCVN 40:2011; 12,000 VND/m³.

Communication

Fibre-optic internet; telecom from national grid providers.

Pricing

Land rental

Land lease: ~50 USD/m² (full 50-year term). Plot sizes 2–10 ha.

Factory / Workshop

Ready-built factory: ~4.0 USD/m²/month.

Power tariff

Off-peak 1,200 VND/kWh; Normal 1,900 VND/kWh; Peak 2,900 VND/kWh.

Water tariff

Water: 10,500 VND/m³.

Wastewater fee

Wastewater: 12,000 VND/m³.

Service charges

Infrastructure service fee: 0.4 USD/m²/year.

Policies & Services

Policies

CIT: 17% for 10 years; 2-year exemption + 50% reduction for 4 years (new investment). Land rent exemption for eligible projects. Import duty exemption on machinery for fixed assets.

Project Location & Nearby

Searching within 5 km radius
Loading data…

Logistics Distance

Distance mode By road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1 Hai Phong Port Nearest 41.9 km
2 Cai Lan Port 82.0 km
3 Nghi Son Port 167.0 km
4 Vung Ang Port 305.6 km
5 Chan May Port 530.7 km
1 Hanoi River Port Nearest 45.2 km
2 Nam Dinh River Port 46.4 km
3 Ninh Binh River Port 69.8 km
4 Viet Tri River Port 105.4 km
5 Binh Duong River Port 1,094.1 km
1 Cat Bi Int. Airport Nearest 46.4 km
2 Noi Bai Int. Airport 66.2 km
3 Tho Xuan Airport (THD) 132.5 km
4 Vinh Airport (VII) 240.1 km
5 Dong Hoi Airport (VDH) 369.0 km
1 Hanoi - Hai Phong Expressway (CT03) Nearest 14.6 km
2 Hanoi - Bac Giang Expressway (CT05) 49.4 km
3 Hanoi - Thai Nguyen Expressway (CT02) 52.2 km
4 CT01 Expressway: Phap Van - Ninh Binh 52.4 km
5 Hanoi - Hoa Binh Expressway (CT07) 58.2 km
1 Hai Phong Railway Station Nearest 42.8 km
2 Hanoi Railway Station 50.8 km
3 Vinh Railway Station 246.8 km
4 Dong Hoi Railway Station 372.4 km
5 Hue Railway Station 503.2 km
1 Hai Duong City Nearest 13.6 km
2 Hung Yen City 30.5 km
3 Hai Phong City 42.7 km
4 Bac Ninh City 45.8 km
5 Nam Dinh City 45.9 km
Straight-line distance is an estimate. Road distance is calculated from the available routing service.

Investment Decision Tools

Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.

CIT Tax Incentive

Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt 2 years
50% reduction 4 years
Total incentive 10 years
NĐ 218/2013/NĐ-CP

Minimum Wage Region Region 4

3.450.000 ₫/month
Hourly wage 16.600 ₫
Effective from 2024-07-01

Workforce & Education

Province population 4,664K people

Setup Cost Estimator Interactive

Reference data — based on IP land, power, water prices and regional minimum wage 4.

Login Log in to save calculation scenarios.

Data sources & verification

Data Source Last verified Status
Overview & legal Not provided Not verified Unverified
Prices & fees Not provided Not verified Unverified
Available land & occupancy Not provided Not verified Unverified
Infrastructure Not provided Not verified Unverified
Logistics Not provided Not verified Unverified

Industrial Park Transparency

Occupancy, price movements, and infrastructure status updated over time.

Recorded data

Price history chart

Quarterly rental price trends from aggregated market sources.

Loading data...

* Prices are indicative. Contact the industrial park management board for official quotations.

Ratings & Reviews (0)

Share practical feedback about infrastructure, service, pricing, and site experience.

0.0
0 reviews
5
0
4
0
3
0
2
0
1
0

Write a review

Guest reviews are moderated before publishing.

FAQ

Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.

VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.