Xuan Cau IP & Free Trade Zone (752 ha) is a major logistics-industrial complex inside Dinh Vu – Cat Hai Economic Zone, adjacent to Lach Huyen international gateway port.
Located on Cat Hai Island, Cat Hai district, Hai Phong City, immediately behind Lach Huyen international gateway port – the deepest container port in North Vietnam. Within Dinh Vu – Cat Hải Economic Zone. Distance from city centre ~45 km; Cat Bi airport ~50 km.
Infrastructure
Traffic
Directly connected to Lach Huyen container port (capacity 1.1 million TEU, depth 14.5 m) – 2 km; QL14B port road; Tan Vu – Lach Huyen bridge; Cat Hai – Cat Ba ferry. Hai Phong city centre ~45 km; Hanoi ~120 km.
Power supply
110/22 kV dedicated substation; 3-phase power reliable; off-peak 1,200 VND/kWh; normal 2,100 VND/kWh; peak 3,000 VND/kWh.
Water supply
Water supply from Cat Hai Water Plant; capacity planned at 10,000–30,000 m³/day to serve the full 752 ha development.
Water: 12,000 VND/m³ (industrial). Capacity guaranteed for all tenants.
Wastewater fee
Wastewater treatment: 14,000 VND/m³ (QCVN 40:2011 column A output standard).
Service charges
Infrastructure service fee: 0.5 USD/m²/year.
Policies & Services
Policies
Dinh Vu – Cat Hai Economic Zone incentives: 10% CIT for 15 years; 4-year full exemption + 50% reduction for 9 years (Law on Investment 2020). 11-year land rent exemption. EPE enterprises: VAT exemption, import/export duty exemption on goods in/out of FTZ. Import duty exemption on fixed-asset machinery.
Distance modeBy road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1
Cai Lan Port
Nearest
23.9 km
Not loaded
2
Hai Phong Port
31.4 km
Not loaded
3
Nghi Son Port
198.2 km
Not loaded
4
Vung Ang Port
304.6 km
Not loaded
5
Chan May Port
505.2 km
Not loaded
1
Nam Dinh River Port
Nearest
92.2 km
Not loaded
2
Hanoi River Port
115.3 km
Not loaded
3
Ninh Binh River Port
117.9 km
Not loaded
4
Viet Tri River Port
172.2 km
Not loaded
5
Binh Duong River Port
1,088.5 km
Not loaded
1
Cat Bi Int. Airport
Nearest
25.3 km
Not loaded
2
Noi Bai Int. Airport
129.9 km
Not loaded
3
Tho Xuan Airport (THD)
183.6 km
Not loaded
4
Vinh Airport (VII)
263.6 km
Not loaded
5
Dong Hoi Airport (VDH)
364.4 km
Not loaded
1
Ha Long - Hai Phong Expressway (CT10)
Nearest
21.6 km
Not loaded
2
Ha Long - Van Don Expressway (CT11)
46.6 km
Not loaded
3
Hanoi - Hai Phong Expressway (CT03)
81.2 km
Not loaded
4
Van Don - Mong Cai Expressway (CT12)
99.8 km
Not loaded
5
Bac Giang - Lang Son Expressway (CT06)
101.4 km
Not loaded
1
Hai Phong Railway Station
Nearest
30.2 km
Not loaded
2
Hanoi Railway Station
119.8 km
Not loaded
3
Vinh Railway Station
269.7 km
Not loaded
4
Dong Hoi Railway Station
367.7 km
Not loaded
5
Hue Railway Station
483.2 km
Not loaded
1
Ha Long City
Nearest
23.5 km
Not loaded
2
Hai Phong City
29.7 km
Not loaded
3
Hai Duong City
69.8 km
Not loaded
4
Nam Dinh City
91.6 km
Not loaded
5
Hung Yen City
95.9 km
Not loaded
Straight-line distance is an estimate. Road distance is calculated from the available routing service.
Investment Decision Tools
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
CIT Tax Incentive
Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt2 years
50% reduction4 years
Total incentive10 years
NĐ 218/2013/NĐ-CP
Minimum Wage Region Region 4
3.450.000 ₫/month
Hourly wage16.600 ₫
Effective from2024-07-01
Workforce & Education
Province population4,664K people
Setup Cost Estimator Interactive
Reference data — based on IP land, power, water prices and regional minimum wage 4.
Occupancy, price movements, and infrastructure status updated over time.
Recorded data
Price history chart
Quarterly rental price trends from aggregated market sources.
Loading data...
No price history is available for this type.
* Prices are indicative. Contact the industrial park management board for official quotations.
Ratings & Reviews (0)
Share practical feedback about infrastructure, service, pricing, and site experience.
0.0
0 reviews
5
0
4
0
3
0
2
0
1
0
Write a review
FAQ
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.
Investors should review land availability, lease term, infrastructure readiness, utilities, workforce access, logistics distance, management support, and applicable investment incentives before making a site visit or reservation.
Straight-line distance is estimated from map coordinates. Road distance is calculated through the routing service when you switch the Logistics Distance mode to By road.
Yes. Use the Contact / Send inquiry form on this page and include your required land area, factory size, industry, timeline, and preferred contact method.
Typical documents include company profile, proposed project scope, investment capital, land or factory demand, environmental requirements, and expected implementation schedule.
Contact / Send inquiry
Send your requirements to the industrial park team. We will route the message with the selected purpose and project details.
Login
Select Location
Filter products by location
Product successfully added to your cart!
VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.