Phu Thai town, Kim Thanh district, Hai Phong City (former Hai Duong).
Infrastructure
Traffic
On QL5; Hai Phong port 35km; HN–HP expressway 6km.
Power supply
Power supply via 22/35kV national grid (EVN Hai Phong); multiple backup substations ensuring 99.9% reliability.
Water supply
Clean water from regional waterworks (An Duong / Cau Nguyet), capacity 5,000–20,000 m³/day, QCVN 01:2009/BYT compliant.
Wastewater treatment
Centralised wastewater treatment plant, capacity 5,000–15,000 m³/day, treated to QCVN 40:2011/BTNMT column A.
Internet
Full FTTH fibre-optic coverage; VNPT/Viettel/FPT/CMC services; ≥1Gbps for enterprise tenants; redundant international links.
Policies & Services
Policies
CIT incentive: 10% for 15 years, 4-year exemption + 50% reduction for the next 9 years (Law on Investment 2020). 11-year land rent exemption; import duty exemption on fixed-asset machinery. IPs inside Dinh Vu – Cat Hai EZ receive additional special incentives.
Distance modeBy road shows the real driving distance to ports, airports and borders (default). Turn on Straight line for a quick as-the-crow-flies estimate.
1
Hai Phong Port
Nearest
19.7 km
Not loaded
2
Cai Lan Port
55.0 km
Not loaded
3
Nghi Son Port
191.6 km
Not loaded
4
Vung Ang Port
321.3 km
Not loaded
5
Chan May Port
537.9 km
Not loaded
1
Hanoi River Port
Nearest
67.3 km
Not loaded
2
Nam Dinh River Port
71.5 km
Not loaded
3
Ninh Binh River Port
97.0 km
Not loaded
4
Viet Tri River Port
121.8 km
Not loaded
5
Binh Duong River Port
1,109.6 km
Not loaded
1
Cat Bi Int. Airport
Nearest
26.7 km
Not loaded
2
Noi Bai Int. Airport
79.3 km
Not loaded
3
Tho Xuan Airport (THD)
161.4 km
Not loaded
4
Vinh Airport (VII)
263.2 km
Not loaded
5
Dong Hoi Airport (VDH)
383.8 km
Not loaded
1
Hanoi - Hai Phong Expressway (CT03)
Nearest
33.6 km
Not loaded
2
Ha Long - Hai Phong Expressway (CT10)
51.8 km
Not loaded
3
Hanoi - Bac Giang Expressway (CT05)
54.7 km
Not loaded
4
Hanoi - Thai Nguyen Expressway (CT02)
65.6 km
Not loaded
5
Bac Giang - Lang Son Expressway (CT06)
70.6 km
Not loaded
1
Hai Phong Railway Station
Nearest
21.0 km
Not loaded
2
Hanoi Railway Station
70.9 km
Not loaded
3
Vinh Railway Station
269.8 km
Not loaded
4
Dong Hoi Railway Station
387.2 km
Not loaded
5
Hue Railway Station
512.6 km
Not loaded
1
Hai Duong City
Nearest
21.7 km
Not loaded
2
Hai Phong City
22.0 km
Not loaded
3
Bac Ninh City
52.2 km
Not loaded
4
Ha Long City
58.5 km
Not loaded
5
Hung Yen City
60.4 km
Not loaded
Straight-line distance is an estimate. Road distance is calculated from the available routing service.
Investment Decision Tools
Reference figures for quick cost, incentive, and logistics assessment. Use the calculator below to simulate scenarios.
CIT Tax Incentive
Tax rate
17%
Ưu đãi thuế chuẩn KCN
100% exempt2 years
50% reduction4 years
Total incentive10 years
NĐ 218/2013/NĐ-CP
Minimum Wage Region Region 4
3.450.000 ₫/month
Hourly wage16.600 ₫
Effective from2024-07-01
Workforce & Education
Province population4,664K people
Setup Cost Estimator Interactive
Reference data — based on IP land, power, water prices and regional minimum wage 4.
Occupancy, price movements, and infrastructure status updated over time.
Recorded data
Price movement
Land rent
USD/m²/year · 01/01/2026
52.00
USD
Factory rent
USD/m²/year · 01/01/2026
3.90
USD
Water price
VND/m³ · 01/01/2026
9,000.00
VND
Power price
VND/kWh · 01/01/2026
2,350.00
VND
Prices may vary by area, location, and lease term.
Price history chart
Quarterly rental price trends from aggregated market sources.
Loading data...
No price history is available for this type.
* Prices are indicative. Contact the industrial park management board for official quotations.
Ratings & Reviews (0)
Share practical feedback about infrastructure, service, pricing, and site experience.
0.0
0 reviews
5
0
4
0
3
0
2
0
1
0
Write a review
FAQ
Common investor questions about industrial park selection, logistics, pricing, and inquiry preparation.
Investors should review land availability, lease term, infrastructure readiness, utilities, workforce access, logistics distance, management support, and applicable investment incentives before making a site visit or reservation.
Straight-line distance is estimated from map coordinates. Road distance is calculated through the routing service when you switch the Logistics Distance mode to By road.
Yes. Use the Contact / Send inquiry form on this page and include your required land area, factory size, industry, timeline, and preferred contact method.
Typical documents include company profile, proposed project scope, investment capital, land or factory demand, environmental requirements, and expected implementation schedule.
Contact / Send inquiry
Send your requirements to the industrial park team. We will route the message with the selected purpose and project details.
Login
Select Location
Filter products by location
Product successfully added to your cart!
VIIPIP uses cookies and browser storage for sessions, saved shortlists and map preferences. Dismissing this notice does not consent to optional tracking. Cookie Policy.